Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 4 Lane Bypass To Nh114 A Connecting Nh333 And Nh133(deoghar Bypass) Frm Design Km 0.000 To Design Km 49.000(total Length 49.000 Km)in The State Of Jharkhand On Ham
|
| Description |
Construction Of 4 Lane Bypass To Nh114 A Connecting Nh333 And Nh133(deoghar Bypass) Frm Design Km 0.000 To Design Km 49.000(total Length 49.000 Km)in The State Of Jharkhand On Ham
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2022_NHAI_137158_1 |
|
Reference Number |
NHAI/11012/JH/ Deoghar-Bypass/2022-23 |
| Tender Fee | 1.1 Lakh |
| EMD | 10.48 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | December 03, 2022 00:25 |
| End Date |
Expired
20/11/2023
Expired 1005 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreWidening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Read moreOnstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreIe services for construction of 4 lane bypass to nh114a connecting nh-333 and nh-133(deoghar bypass) from design km 0.000 to design km 49.000 total length 49.000 km in jharkhand on ham
Ie services for construction of 4 lane bypass to nh114a connecting nh-333 and nh-133(deoghar bypass) from design km 0.000 to design km 49.000 total length 49.000 km in jharkhand on ham
Read moreIe service for construction of 4-lane of dewas-ujjain section of nh752d from design km 0.000 to 19.733 including ujjain bypass from design km 19.733 to 26.900 (parti) and dewas bypass from design km 0.000 to 14.520 (partii) total length of 41.42 km
Ie service for construction of 4-lane of dewas-ujjain section of nh752d from design km 0.000 to 19.733 including ujjain bypass from design km 19.733 to 26.900 (parti) and dewas bypass from design km 0.000 to 14.520 (partii) total length of 41.42 km
Read moreConstruction of 4 lane western bypass of gwalior from km 0.000 to km 28.516 in the state of madhya pradesh on ham mode.
Construction of 4 lane western bypass of gwalior from km 0.000 to km 28.516 in the state of madhya pradesh on ham mode.
Read moreConstruction of 6 lane zirakpur bypass (pkg i) (ing from junction with nh7 (zirakpur patiala) (design ch. 0.000) and ending at (design ch. 8.500) near kishanpura (total length 9.800 km) in punjab under nh (o) on ham
Construction of 6 lane zirakpur bypass (pkg i) (ing from junction with nh7 (zirakpur patiala) (design ch. 0.000) and ending at (design ch. 8.500) near kishanpura (total length 9.800 km) in punjab under nh (o) on ham
Read moreMaintenance of bhopal bypass road length 26 km (2 lane) in total length of 52 km (4 lane)
Maintenance of bhopal bypass road length 26 km (2 lane) in total length of 52 km (4 lane)
Read moreConst of 4lane access controlled gf from kereya to keyondpani sec of nh 143d ing frm design chain. 28.953 to design chain 59.300 length 30.347 km on ham in jharkhand (pkgii)
Const of 4lane access controlled gf from kereya to keyondpani sec of nh 143d ing frm design chain. 28.953 to design chain 59.300 length 30.347 km on ham in jharkhand (pkgii)
Read moreConstruction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.
Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.
Read moreof your Industry type