Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Design And Execution For Construction Of 400 M Length Avalanche Protection System At Km 5.550 To Km 5.660, Km 7.900 To Km 7.950, Km 27.200 To Km 27.280, Km 28.370 To Km 28.460 And Km 29.200 To Km 29.270 On D S Rd I.E. Approach Road To Shinkunla Tnl
|
Description |
Design And Execution For Construction Of 400 M Length Avalanche Protection System At Km 5.550 To Km 5.660, Km 7.900 To Km 7.950, Km 27.200 To Km 27.280, Km 28.370 To Km 28.460 And Km 29.200 To Km 29.270 On D S Rd I.E. Approach Road To Shinkunla Tnl
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id | 2025_BRO_703047_1 |
Reference Number |
CE (P) YJK - 09 of 2024-25 |
Tender Fee | 10000 |
EMD | 40 Lakh |
Tender Value | |
Place | Approach Road to proposed Shinkun La Tunnel |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=787498 |
Start Date | May 01, 2025 15:30 |
End Date |
17/05/2025 ( Expired 50 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc
Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc
Read moreDesign and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreSpecial repair by pdg. wdg. stg., /pc/ipb of 4 nos. roads i.e. 1. wdg. and stg on road from farwain kalan to darbi in km 0.0 to 4.58 (road id 9596), 2. wdg. and stg. on road from bharokhan to jhanda kalan in km 0.0 to 2.20 (road id 5981) , 3. pdg s
Special repair by pdg. wdg. stg., /pc/ipb of 4 nos. roads i.e. 1. wdg. and stg on road from farwain kalan to darbi in km 0.0 to 4.58 (road id 9596), 2. wdg. and stg. on road from bharokhan to jhanda kalan in km 0.0 to 2.20 (road id 5981) , 3. pdg s
Read moreConstruction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Read moreDesign and cost estimate for rehabilitation and strengthening of bridge/approach road of bridge at km-12 (210m span) at km-14 (75m span) and at km-16 (90 m span) on jauligrant-thano-raipur motor road in distt dehradun.
Design and cost estimate for rehabilitation and strengthening of bridge/approach road of bridge at km-12 (210m span) at km-14 (75m span) and at km-16 (90 m span) on jauligrant-thano-raipur motor road in distt dehradun.
Read moreA/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.
A/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.
Read moreConstruction of nh 752 b to biaora suthaliya road to gindorhat salehpur jod road length 3.00 km (1st call on sor road and bridge 11/04/2025 time period 180 days i/c r/s)
Construction of nh 752 b to biaora suthaliya road to gindorhat salehpur jod road length 3.00 km (1st call on sor road and bridge 11/04/2025 time period 180 days i/c r/s)
Read moreof your Industry type