Tender Details

Particulars Details
Title
Design And Execution For Construction Of 400 M Length Avalanche Protection System At Km 5.550 To Km 5.660, Km 7.900 To Km 7.950, Km 27.200 To Km 27.280, Km 28.370 To Km 28.460 And Km 29.200 To Km 29.270 On D S Rd I.E. Approach Road To Shinkunla Tnl
Description
Design And Execution For Construction Of 400 M Length Avalanche Protection System At Km 5.550 To Km 5.660, Km 7.900 To Km 7.950, Km 27.200 To Km 27.280, Km 28.370 To Km 28.460 And Km 29.200 To Km 29.270 On D S Rd I.E. Approach Road To Shinkunla Tnl
Organisation Dte General Border Roads Organisation | Central Govt. Ministry/Department
Tender Id 2025_BRO_703047_1
Reference
Number
CE (P) YJK - 09 of 2024-25
Tender Fee 10000
EMD 40 Lakh
Tender Value
Place Approach Road to proposed Shinkun La Tunnel
Link https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=787498
Start Date May 01, 2025 15:30
End Date

17/05/2025 ( Expired 50 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc

Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc

Read more
Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road

Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road

Read more
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Read more
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Read more
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Read more
Special repair by pdg. wdg. stg., /pc/ipb of 4 nos. roads i.e. 1. wdg. and stg on road from farwain kalan to darbi in km 0.0 to 4.58 (road id 9596), 2. wdg. and stg. on road from bharokhan to jhanda kalan in km 0.0 to 2.20 (road id 5981) , 3. pdg s

Special repair by pdg. wdg. stg., /pc/ipb of 4 nos. roads i.e. 1. wdg. and stg on road from farwain kalan to darbi in km 0.0 to 4.58 (road id 9596), 2. wdg. and stg. on road from bharokhan to jhanda kalan in km 0.0 to 2.20 (road id 5981) , 3. pdg s

Read more
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.

Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.

Read more
Design and cost estimate for rehabilitation and strengthening of bridge/approach road of bridge at km-12 (210m span) at km-14 (75m span) and at km-16 (90 m span) on jauligrant-thano-raipur motor road in distt dehradun.

Design and cost estimate for rehabilitation and strengthening of bridge/approach road of bridge at km-12 (210m span) at km-14 (75m span) and at km-16 (90 m span) on jauligrant-thano-raipur motor road in distt dehradun.

Read more
A/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.

A/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.

Read more
Construction of nh 752 b to biaora suthaliya road to gindorhat salehpur jod road length 3.00 km (1st call on sor road and bridge 11/04/2025 time period 180 days i/c r/s)

Construction of nh 752 b to biaora suthaliya road to gindorhat salehpur jod road length 3.00 km (1st call on sor road and bridge 11/04/2025 time period 180 days i/c r/s)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise