Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work Of Rehabilitation And Construction Of Barela Mandla Section Of Nh 30 From Km 22/8 To 89/6 (Length 63.55 Km) Two Lane With Paved Shoulder In The State Of Madhya Pradesh On Epc Mode
|
| Description |
Balance Work Of Rehabilitation And Construction Of Barela Mandla Section Of Nh 30 From Km 22/8 To 89/6 (Length 63.55 Km) Two Lane With Paved Shoulder In The State Of Madhya Pradesh On Epc Mode
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_745062_1 |
|
Reference Number |
20020/MPRDC/Barela/2022-23 |
| Tender Fee | 11800 |
| EMD | 53.94 Lakh |
| Tender Value | |
| Place | 45A, Arera Hills, Bhopal |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | March 14, 2023 23:00 |
| End Date |
Expired
05/07/2023
Expired 1091 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of two lane with paved shoulder of jhabua petlawad section of nh 147e in the state of madhya pradesh on epc mode.
Construction of two lane with paved shoulder of jhabua petlawad section of nh 147e in the state of madhya pradesh on epc mode.
Read moreUpgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreBalance work for construction of 2-lane with paved shoulder from km 80.800 to km 85.250 (satna-maihar) section of nh 135bg (design length 4.450 km) in the state of madhya pradesh on epc mode
Balance work for construction of 2-lane with paved shoulder from km 80.800 to km 85.250 (satna-maihar) section of nh 135bg (design length 4.450 km) in the state of madhya pradesh on epc mode
Read moreBalance work of widening and upgradation to two lane with paved shoulders of pawai-saleha-jasso-nagod section of nh-943 (length - 12.49 km) in the state of madhya pradesh on epc mode.
Balance work of widening and upgradation to two lane with paved shoulders of pawai-saleha-jasso-nagod section of nh-943 (length - 12.49 km) in the state of madhya pradesh on epc mode.
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreof your Industry type