Tender Details

Particulars Details
Title
Appointing Full Time Guard/Watchmen/Labour On Under Construction Projects
Description
Appointing Full Time Guard Watchmen Labour On Under Construction Projects Arjuna,Muchkundi, Chinchawadi, Tide, Berdewadi And Talawade , River Nodal Points And On Under Construction Canal To Handle Emergency Situation In Rainy Season And Cleaninggras
Organisation Government of Maharashtra
Tender Id 2023_CWRDK_967313_1
Reference
Number
E-TenderNoti.no7 for23-24
Tender Fee 2360
EMD 11200
Tender Value
Place IPCD Ratnagiri
Link https://mahatenders.gov.in
Start Date December 04, 2023 16:30
End Date

18/12/2023 ( Expired 547 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Read more
Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh

Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh

Read more
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Read more
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511

Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)

Read more
Construction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77

Construction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77

Read more
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Construction and installation of advanced fstp of 6 kld capacity based on bac fstp on a dbot model with 5 years operation and maintenance (oandm) at gopalpur g.p under kanksa development block in the district of paschim bardhaman

Construction and installation of advanced fstp of 6 kld capacity based on bac fstp on a dbot model with 5&amp#x0d years operation and maintenance (oandm) at gopalpur g.p under kanksa development block in the district of&amp#x0d paschim bardhaman

Read more
2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia

2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise