Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Btps
|
| Description |
Supply Of Gear Box Bearings For Belt Conveyors Required In Mm Division Of Chp/Btps (Make: Skf, Ntn, Fag).
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 546051 |
|
Reference Number |
e-90/2024-25/CE/Const/BTPS/Pur4/CHP/Gear box bearings for belt conveyors(Make: SKF, NTN, FAG) |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | September 26, 2024 23:30 |
| End Date |
Expired
17/10/2024
Expired 729 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of certain bearings of make: skf/schaeffler(fag)/timken/ntn/nsk for chp circle and bm divisions of btps
Supply of certain bearings of make: skf/schaeffler(fag)/timken/ntn/nsk for chp circle and bm divisions of btps
Read moreBelt monitoring system for critical conveyors of chp unit1&2.
Supply, erection & commissioning of belt monitoring system for critical conveyors of chp.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreSupply of electromagnetic type suspension magnet required by lt-1/o and e/chp/ btps
Supply of electromagnetic type suspension magnet required by lt-1/o and e/chp/ btps
Read moreSupply of wear plate for dozer blades required in mm-iv sub division of chp/btps
Supply of wear plate for dozer blades required in mm-iv sub division of chp/btps
Read moreSupply of screen plates for vibrating grizzly feeders required in mm-ii sub division of mm/chp/btps
Supply of screen plates for vibrating grizzly feeders required in mm-ii sub division of mm/chp/btps
Read moreSupply of super critical type-a1-low speed bearings required for various pumps in tm division/stage-i and ii/btps
Supply of super critical type-a1-low speed bearings required for various pumps in tm division/stage-i and ii/btps
Read moreProcurement of various steel items (various angles, channels, plates and flats) required for various route and chute at chp, btps.
Procurement of various steel items (various angles, channels, plates and flats) required for various route and chute at chp, btps.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreof your Industry type