Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Epc Contract For Design, Supply, Erection, Commissioning, Testing And Trial Run Of Coal Evacuation System By Belt Conveyors And Dispatch Through Rapid Loading System (Rls) With Silo At Vk Chp (6 Mtpa), Kgm Area, Including Operation And Maintenance During The Five Year Defect Liability Period (Dlp).
|
| Description |
Epc Contract For Design, Supply, Erection, Commissioning, Testing And Trial Run Of Coal Evacuation System By Belt Conveyors And Dispatch Through Rapid Loading System (Rls) With Silo At Vk Chp (6 Mtpa), Kgm Area, Including Operation And Maintenance During The Five Year Defect Liability Period (Dlp).
|
| Organisation | THE SINGARENI COLLIERIES COMPANY LIMITED-Corp-MP |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 269.19 Crore |
| Place | Telangana |
| Link | Login to view |
| Start Date | October 12, 2026 16:00 |
| End Date |
Open
19/10/2026
4 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preengineered turnkey execution for design,supply,erection, commissioning,trial run,testing, o and m during dlp for chp with belt conveyors 40 mty and dispatch through 3 silo with rls at barpali bulb with 4 mty apwtls at integrated kg ocp,ba,mcl(phi)
Preengineered turnkey execution for design,supply,erection, commissioning,trial run,testing, o and m during dlp for chp with belt conveyors 40 mty and dispatch through 3 silo with rls at barpali bulb with 4 mty apwtls at integrated kg ocp,ba,mcl(phi)
Read morePlanning, design, engineering, construction, fabrication, erection, supply, installation, testing, trial run and commissioning of chp consisting of rcc silo ..... at rampur batura ocp (4.0mtpa) of sohagpur area, with dlp period of 05 years.
Planning, design, engineering, construction, fabrication, erection, supply, installation, testing, trial run and commissioning of chp consisting of rcc silo ..... at rampur batura ocp (4.0mtpa) of sohagpur area, with dlp period of 05 years.
Read morePre-engineered turnkey execution for design, supply, erection, commissioning, trial run, testing with o and m during dlp etc. for coal handling plant with silo loading arrangement at lakhanpur area, ib valley coalfields of mcl.
Pre-engineered turnkey execution for design, supply, erection, commissioning, trial run, testing with o and m during dlp etc. for coal handling plant with silo loading arrangement at lakhanpur area, ib valley coalfields of mcl.
Read moreConst. of 16.5mty chp on preengineered turnkey basis for design,supply,erection, commissioning,trial run,testing,oandm during dlp for coal evacuation 12.5mty from kg mines by pipe/trough conveyor to sardega chp u/c,const. of 4mty atls at kgocp,ba,mcl
Const. of 16.5mty chp on preengineered turnkey basis for design,supply,erection, commissioning,trial run,testing,oandm during dlp for coal evacuation 12.5mty from kg mines by pipe/trough conveyor to sardega chp u/c,const. of 4mty atls at kgocp,ba,mcl
Read moreof your Industry type