Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Construction, Installation, Testing, Commissioning, Trial Run, Dlp And Operation And Maintenance Of 15 Mgd (68.10 Mld) Wastewater Treatment Plant, Sewage Pumping Stations At Hiranki And Zindpur, Allied Rising Mains And Treated..... Nit 01
|
| Description |
Nit No. 01 (2025 26)/Ee(c)dr Iii
|
| Organisation | Delhi Jal Board | State Govt. and UT |
| Tender Id | 2025_DJB_273995_1 |
|
Reference Number |
NIT No. 01 (2025-26)/EE(C)DR-III |
| Tender Fee | 1500 |
| EMD | 2.44 Crore |
| Tender Value | - |
| Place | OFFICE OF EXECUTIVE ENGINEER (C) DR. III |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=361801 |
| Start Date | July 17, 2025 17:30 |
| End Date |
Expired
04/08/2025
Expired 390 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 15 mgd wastewater treatment plant at zindpur, power generation and other associated / allied appurtenant work with effluent standard of bod-10mg/l, tss-10mg/l or better on dbo basis and construction of 22 mgd wwpss at zindpura 9 mgd w
Nit no. 02 (2025-26)/ee(c)dr-iii
Read moreConstruction of 17.0 mgd wastewater treatment plant at mitraon with other associated / allied appurtenant work along with 15 years onm including 02 years dlp nit- 04
Nit no.4 /ee (p) sr.ii/ (2025-26)
Read moreConstruction of co-treatment for septage facilities of capacity 260 kld, at kargi stp in dehradun including all appurtenant structures, allied works like rising mains etc. and six month trial and run period of the complete works
Construction of co-treatment for septage facilities of capacity 260 kld, at kargi stp in dehradun including all appurtenant structures, allied works like rising mains etc. and six month trial and run period of the complete works
Read moreRepair/maint of external water supply distribution lines, rising mains, connected works cleaning of oht/ug sumps and house service tanks treated water to stp, maint of choloronomes plant at hqtc bangalore
Repair/maint of external water supply distribution lines, rising mains, connected works cleaning of oht/ug sumps and house service tanks treated water to stp, maint of choloronomes plant at hqtc bangalore
Read morePlanning, design, engineering, construction, fabrication, erection, supply, installation, testing, trial run and commissioning of chp consisting of rcc silo ..... at rampur batura ocp (4.0mtpa) of sohagpur area, with dlp period of 05 years.
Planning, design, engineering, construction, fabrication, erection, supply, installation, testing, trial run and commissioning of chp consisting of rcc silo ..... at rampur batura ocp (4.0mtpa) of sohagpur area, with dlp period of 05 years.
Read morePlanning, design, engineering, construction, fabrication, supply, erection, trial run and commissioning of 2x2.5 mva, 33kv/3.3kv substation including operation and maintenance during dlp of 60months on turnkey basis at kanchan ocp, johilla area, secl
Planning, design, engineering, construction, fabrication, supply, erection, trial run and commissioning of 2x2.5 mva, 33kv/3.3kv substation including operation and maintenance during dlp of 60months on turnkey basis at kanchan ocp, johilla area, secl
Read morePre-engineered turnkey execution for design, supply, erection, commissioning, trial run, testing with o and m during dlp etc. for coal handling plant with silo loading arrangement at lakhanpur area, ib valley coalfields of mcl.
Pre-engineered turnkey execution for design, supply, erection, commissioning, trial run, testing with o and m during dlp etc. for coal handling plant with silo loading arrangement at lakhanpur area, ib valley coalfields of mcl.
Read morePlanning, design, engineering, construction, fabrication, supply,erection, trial run and commissioning of 2x6.3 mva, 33kv/3.3kv substation including operation maintenance during dlp of 60 months on turnkey basis at katkona ug secl as detailed in nit
Planning, design, engineering, construction, fabrication, supply,erection, trial run and commissioning of 2x6.3 mva, 33kv/3.3kv substation including operation maintenance during dlp of 60 months on turnkey basis at katkona ug secl as detailed in nit
Read moreConstruction of co-treatment for septage facilities of capacity 260 kld, at kargi stp in dehradun including all appurtenant structures, allied works like rising mains etc. and six month trial and period of the complete works
Construction of co-treatment for septage facilities of capacity 260 kld, at kargi stp in dehradun including all appurtenant structures, allied works like rising mains etc. and six month trial and period of the complete works
Read moreJjm- wss to kottangal panchayath - design, construction, trial run and commissioning of 3 mld wtp and allied works including o and m for 3 year, supply and laying rw and cw pumping mains and supply and erection of pumpsets
Jjm- wss to kottangal panchayath- design, construction, trial run and commissioning of 3 mld wtp and allied works including o and m for 3 year, supply and laying rw and cw pumping mains and supply and erection of pumpsets
Read moreof your Industry type