Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Provd. And Fixing Real Time Sewage Treated /Influent Water Quality System At Inlet Of 7 Mld Stp Gharaunda Including 3 Months Trial Run Period, One Year Defect Liability Period And Thereafter 4 Year Operation And Maintenance And All Other Works
|
| Description |
Provd. And Fixing Real Time Sewage Treated /Influent Water Quality System At Inlet Of 7
Mld Stp Gharaunda Including 3 Months Trial Run Period, One Year Defect Liability Period
And Thereafter 4 Year Operation And Maintenance And All Other Works
|
| Organisation | Government of Haryana |
| Tender Id | 2023_HRY_291467_1 |
|
Reference Number |
20231AD918C5 CE79 4313 964C 079668619CD7572PUH |
| Tender Fee | 1000 |
| EMD | 20000 |
| Tender Value | - |
| Place | EE PHE Division No. 2 Karnal |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | June 19, 2023 22:30 |
| End Date |
Expired
26/06/2023
Expired 1206 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Procurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreRepair, retrofitting, operation and maintenance of rural water supply schemes with 3 months trial run after commissioning and comprehensive operation and maintenance of 120 months after successful completion of trial run period under jjm, up
Repair, retrofitting, operation and maintenance of rural water supply schemes with 3 months trial run after commissioning and comprehensive operation and maintenance of 120 months after successful completion of trial run period under jjm, up
Read morePlanning, design, engineering, construction, fabrication, supply, erection, trial run and commissioning of 2x4 mva, 33kv/3.3kv substation including operation and maintenance during defect liability period on turnkey basis at shiwani ug mine
Planning, design, engineering, construction, fabrication, supply, erection, trial run and commissioning of 2x4 mva, 33kv/3.3kv substation including operation and maintenance during defect liability period on turnkey basis at shiwani ug mine
Read moreRe-surfacing of 60 mtr. and 30 mtr. wide roads (balance roads) and thereafter defect liability period (dlp) of 36 months in sector-8 at imt manesar.
Re-surfacing of 60 mtr. and 30 mtr. wide roads (balance roads) and thereafter defect liability period (dlp) of 36 months in sector-8 at imt manesar.
Read moreSupply and supervision till trial run period of automatic power factor correction with associated electrical and mechanical works complete in distt ghaziabad under major replacement fund
Supply and supervision till trial run period of automatic power factor correction with associated electrical and mechanical works complete in distt ghaziabad under major replacement fund
Read moreDesign, construction, installation, testing, commissioning, trial run, dlp and operation and maintenance of 15 mgd (68.10 mld) wastewater treatment plant, sewage pumping stations at hiranki and zindpur, allied rising mains and treated..... nit 01
Nit no. 01 (2025-26)/ee(c)dr-iii
Read moreSupply and supervision till trial run period of automatic power factor correction panels with associated electrical and mechanical works complete at mps in distt.ghaziabad under major replacement fund
Supply and supervision till trial run period of automatic power factor correction panels with associated electrical and mechanical works complete at mps in distt.ghaziabad under major replacement fund
Read moreConstruction of 60 mtr. wide cement concrerte (cc) roads including gsb, dlc, pqc and necessary road furnitures and thereafter defect liability period (dlp) for 60 months in phase-iii at imt, bawal.
Construction of 60 mtr. wide cement concrerte (cc) roads including gsb, dlc, pqc and necessary road furnitures and thereafter defect liability period (dlp) for 60 months in phase-iii at imt, bawal.
Read moreEstablishment of modern incineration plant for fallen animals at kuberpur, agra, uttar pradesh on turn- key basis and thereafter maintenance of the plant during defects liability period of 12 months after successful commissioning
Establishment of modern incineration plant for fallen animals at kuberpur, agra, uttar pradesh on turn- key basis and thereafter maintenance of the plant during defects liability period of 12 months after successful commissioning
Read moreof your Industry type