Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair, Retrofitting, Operation And Maintenance Of Rural Water Supply Schemes With 3 Months Trial Run After Commissioning And Comprehensive Operation And Maintenance Of 120 Months After Successful Completion Of Trial Run Period Under Jjm, Up
|
| Description |
Repair, Retrofitting, Operation And Maintenance Of Rural Water Supply Schemes With 3 Months Trial Run After Commissioning And Comprehensive Operation And Maintenance Of 120 Months After Successful Completion Of Trial Run Period Under Jjm, Up
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPPRD_873537_1 |
|
Reference Number |
5337/310/2023 Dated 21/12/23 |
| Tender Fee | 25000 |
| EMD | 6 Crore |
| Tender Value | - |
| Place | LUCKNOW |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | December 23, 2023 14:30 |
| End Date |
Expired
05/01/2024
Expired 1012 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Read moreProcurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Procurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreInstallation of 05 (five) nos. steel pontoons at kachuberia for holding the gangways of semi-permanent jetties in connection with ganga sagar mela 2027 and re -placement of the same at their original positions after completion of mela operation.
Installation of 05 (five) nos. steel pontoons at kachuberia for holding the gangways of semi-permanent jetties in connection with ganga sagar mela 2027 and re -placement of the same at their original positions after completion of mela operation.
Read moreInstallation of 04 (four) nos. steel pontoons at lot - 8 for holding the gangway of semi-permanent jetties in connection with ganga sagar mela 2027 and re - placement of the same at their original positions after completion of mela operation.
Installation of 04 (four) nos. steel pontoons at lot - 8 for holding the gangway of semi-permanent jetties in connection with ganga sagar mela 2027 and re - placement of the same at their original positions after completion of mela operation.
Read moreUsed water management project in municipal committee reasi under uwm sbm 2.0 incl. operation and maintenance for 5 years after successful completion of free trial of 12 months. contract no sdj/w/60/ 2025-26
By way of design and construction of 3.0 mld sewage treatment plant, construction of interception and di structures at outfalls, conveying mains, ipss incl. o and m for 5 years after successful completion of free trial of 12 months
Read moreUsed water management project in municipal committee bhaderwah under uwm sbm 2.0 incl. operation and maintenance for 5 years after successful completion of free trial of 12 months. contract no sdj/w/108/ 2025-26 (3rd call)
By way of design and construction of 2.0 mld sewage treatment plant, construction of interception and di structures at outfalls, conveying mains, ipss
Read moreUsed water management project in municipal committee bhaderwah under uwm sbm 2.0 incl. operation and maintenance for 5 years after successful completion of free trial of 12 months. contract no sdj/w/14/ 2025-26 (4th call)
By way of design and construction of 2.0 mld sewage treatment plant, construction of interception and di structures at outfalls, conveying mains, ipss
Read moreUsed water management project in municipal committee hiranagar under uwm sbm 2.0 incl. operation and maintenance for 5 years after successful completion of free trial of 12 months. contract no sdj/w/13/ 2026-27 (2nd call)
By way of design and construction of 1.50 mld stp, construction of interception and di structures at outfalls, conveying mains, ipss incl. operation and maintenance for 5 years after successful completion of free trial of 12 months
Read moreUsed water management project in municipal committee vijaypur under uwm sbm 2.0 incl. operation and maintenance for 5 years after successful completion of free trial of 12 months contract no sdj/w/12/ 2026-27 (2nd call)
By way of design and construction of 1.50 mld stp, construction of interception and di structures at outfalls, conveying mains, ipss incl. operation and maintenance for 5 years after successful completion of free trial of 12 months
Read moreof your Industry type