Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Authoritys Engineer For Supervision Of Upgradation Of Mp/Rj Border Sheopur Goras Road Section Of Nh 552 Extn, From Design Ch. 0.00 To 48.400 To 2 L Ps Configuration Along With Oti Of 16.6 Km In The State Of Madhya Pradesh
|
| Description |
Consultancy Services For Authoritys Engineer For Supervision Of Upgradation Of Mp/Rj Border Sheopur Goras Road Section Of Nh 552 Extn, From Design Ch. 0.00 To 48.400 To 2 L Ps Configuration Along With Oti Of 16.6 Km In The State Of Madhya Pradesh
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_768155_1 |
|
Reference Number |
CE-RO/BPL/NH/03/AE/2023-24 |
| Tender Fee | 5000 |
| EMD | 2 Lakh |
| Tender Value | - |
| Place | Regional Office MoRTH Bhopal |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | August 25, 2023 23:00 |
| End Date |
Expired
08/11/2023
Expired 1033 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation of mp/rj border-sheopur-goras road section of nh-552e from design chainage 0.000 to 48.400 km (total length 48.40 km) to two lane with paved shoulder configuration along with oti of 16.6 km in the state of madhya pradesh on epc mode
Upgradation of mp/rj border-sheopur-goras road section of nh-552e from design chainage 0.000 to 48.400 km (total length 48.40 km) to two lane with paved shoulder configuration along with oti of 16.6 km in the state of madhya pradesh on epc mode
Read moreConsultancy services for authoritys engineer for supervision of upgradation of goras to shyampur section of nh-552extn from design ch 48.40 to 111.80 to 2 lane with paved shoulder configuration along with oti of 8.91km in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of upgradation of goras to shyampur section of nh-552extn from design ch 48.40 to 111.80 to 2 lane with paved shoulder configuration along with oti of 8.91km in the state of madhya pradesh
Read moreConsultancy services for authoritys engineer for supervision of upgradation of sarvardevla to pal (mp/mh border) section of nh-347c from design ch 81.600 to 137.400 to 2l ps configuration along with oti of 1.95 km in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of upgradation of sarvardevla to pal (mp/mh border) section of nh-347c from design ch 81.600 to 137.400 to 2l ps configuration along with oti of 1.95 km in the state of madhya pradesh
Read moreUpgradation of goras to shyampur road section of nh-552 ext., from design chainage 48.400 to 111.800 km (total length 63.40 km) to 2 lane with paved shoulder configuration along with oti of 8.91 km in the state of madhya pradesh on epc mode
Upgradation of goras to shyampur road section of nh-552 ext., from design chainage 48.400 to 111.800 km (total length 63.40 km) to 2 lane with paved shoulder configuration along with oti of 8.91 km in the state of madhya pradesh on epc mode
Read moreConsultancy services for authoritys engineer for supervision of rehabilitation, upgradation and widening of existing highway to 2l/4lps (rigid pavement) of nh 160 section- phaltan to mhaishal near karnataka border dahiwadi village to ending at vita
Consultancy services for authoritys engineer for supervision of rehabilitation, upgradation and widening of existing highway to 2l/4lps (rigid pavement) of nh 160 section- phaltan to mhaishal near karnataka border dahiwadi village to ending at vita
Read moreConsultancy services for assisting authoritys engineer for supervision of rehabilitation and upgradation of existing road to two lane with paved shoulder configuration from km 22/300 (mudireddypalli) to 58/635 (kadapa nellore border section) of nh167
Consultancy services for assisting authoritys engineer for supervision of rehabilitation and upgradation of existing road to two lane with paved shoulder configuration from km 22/300 (mudireddypalli) to 58/635 (kadapa nellore border section) of nh167
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur - dabhaura section of nh-135b from km 36/700 to km 73/813 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur - dabhaura section of nh-135b from km 36/700 to km 73/813 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreUpgradation and construction of ambua to mp/gujrat border road section of nh-56 total length 27.590 km to 2 lane with paved shoulder configuration along with oti in 5.88 km length in the state of madhya pradesh on epc mode
Upgradation and construction of ambua to mp/gujrat border road section of nh-56 total length 27.590 km to 2 lane with paved shoulder configuration along with oti in 5.88 km length in the state of madhya pradesh on epc mode
Read moreConsultancy services for authoritys engineer for supervision of upgradation and construction of ambua to mp/gujrat border road section of nh-56 total length 27.590 km to 2 lane with paved shoulder configuration along in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of upgradation and construction of ambua to mp/gujrat border road section of nh-56 total length 27.590 km to 2 lane with paved shoulder configuration along in the state of mp on epc mode
Read moreof your Industry type