Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Imp. Dev. Of Lane
|
| Description |
Imp. Dev. Of Lane By Pdg. Rmc And Drainage System From H.No. 24 To H.No. 38 Pocket A Ashok Vihar Phase Iii Ward No. 66/Kpz, Wazirpur.
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_MCD_160969_1 |
|
Reference Number |
EE(M-II)/KPZ/TC/2023-24/19/01 |
| Tender Fee | 590 |
| EMD | 70300 |
| Tender Value | |
| Place | EE(M-II)KPZ |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | July 13, 2023 23:30 |
| End Date |
Expired
19/07/2023
Expired 1087 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreTerm contract for artificer work incl minor and rev wk at asc, mh, mdc, sho, mes, temple lane, asri, stn hq and store area at ramgarh cantt
Term contract for artificer work incl minor and rev wk at asc, mh, mdc, sho, mes, temple lane, asri, stn hq and store area at ramgarh cantt
Read moreIndigenous development of filtering cartridge of lltr
Indigenous development of filtering cartridge of lltr
Read moreExpression of interest (eoi) for indigenous development of avionic aggregates of mig-29 fleets
Expression of interest (eoi) for indigenous development of avionic aggregates of mig-29 fleets
Read moreProvn of klp (ph-i of two phase) of mi at hisar mil stn
Provn of klp (ph-i of two phase) of mi at hisar mil stn
Read moreStudy of survival and growth behavior of chikhri
Study of survival and growth behavior of chikhri ( buxus wallichiana ) by way of fencing and planting
Read moreTender for purchase of nozzle plate of fibrizer turbine.
Tender for purchase of nozzle plate of fibrizer turbine.
Read moreAppointment of transaction advisor for monetization of road assets
Appointment of transaction advisor for monetization of road assets
Read moreof your Industry type