Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Reconstruction Of Rcc Drain From 34.500 To 34.700 Km And Clearing And Repairing Of Existing Drain With Covering Of Rcc Slab Within Km 33.300 To 34.700 Of Nh 157 In Stretches On Phulbani Town Portion For The Year 2025 26
|
Description |
Reconstruction Of Rcc Drain From 34.500 To 34.700 Km And Clearing And Repairing Of Existing Drain With Covering Of Rcc Slab Within Km 33.300 To 34.700 Of Nh 157 In Stretches On Phulbani Town Portion For The Year 2025 26
|
Organisation | CE-NH | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 1.25 Lakh |
Tender Value | |
Place | Sambalpur |
Link |
AAAAAAAAAA Login to view |
Start Date | July 01, 2025 21:30 |
End Date |
15/07/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.
Improvement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.
Read moreWork of one time treatment of bypassed portion of dharuhera town on nh 919, ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.
Work of one time treatment of bypassed portion of dharuhera town on nh 919,
 ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.
Read moreConsultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Read moreRehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Read moreUpgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreTn.no.04 2025-26 hdo nh dt.20.06.2025
Short term maintenance works stretches from km 167/600 to 187/600 and km 209/00 to 210/150 of new nh 85(old nh 49e) of madurai -cochin road for the year 2024-25
Read moreMtc. of ganganagar village road under pwd(rnb) sub-division during the year 2025-26 sh - construction of rcc u shaped road side drain of length 398.00 mtr ch. 0.492 km to 0.890 km
Construction of rcc u shaped road side drain of length 398.00 mtr ch. 0.492 km to 0.890 km
Read moreUpgradation of khujner town portion road length 1.00 km (pac 195.15 lakh 1st call on road and bridge sor 11/04/2025 time period 120 days i/c rainy season)
Upgradation of khujner town portion road length 1.00 km (pac 195.15 lakh 1st call on road and bridge sor 11/04/2025 time period 120 days i/c rainy season)
Read moreof your Industry type