Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Authority Engineer For Supervision Of Widening To 2 Lane With Hard Shoulder Configuration Of Kali Mandir Chainage Km 133 Pt078 And Lipulekh Chainage Km 159 Pt476 Road Of Nh 09 Under Project Hirak Of Bro In State Of Uttarakhand
|
| Description |
Consultancy Services For Authority Engineer For Supervision Of Widening To 2 Lane With Hard Shoulder Configuration Of Kali Mandir Chainage Km 133 Pt078 And Lipulekh Chainage Km 159 Pt476 Road Of Nh 09 Under Project Hirak Of Bro In State Of Uttarakhand
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2023_MoRTH_785419_1 |
|
Reference Number |
- |
| Tender Fee | 5900 |
| EMD | 0 |
| Tender Value | - |
| Place | Kalimandir to Lipulekh in Pithoragarh district |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=825628 |
| Start Date | January 14, 2024 15:30 |
| End Date |
Expired
08/02/2024
Expired 938 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for authority engineer for supervision of construction of 2 lane with hard shoulder on askote lipulekh road nh 09 between km 56pt935 to km 95pt748 and km 113pt828 to km 133pt078 under project hirak and bharatmala pariyojana
Consultancy services for authority engineer for supervision of construction of 2 lane with hard shoulder on askote lipulekh road nh 09 between km 56pt935 to km 95pt748 and km 113pt828 to km 133pt078 under project hirak and bharatmala pariyojana
Read moreWidening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode
Widening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode
Read moreWidening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode
Widening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode
Read moreConsultancy services for authority engineer for supervision of construction of missing link from birhu to lathiani into 4 lane paved shoulder configuration from km 35 550 design chainage 0 000) to 42 800 design chainage 8 153 on nh 503a
Consultancy services for authority engineer for supervision of construction of missing link from birhu to lathiani into 4 lane paved shoulder configuration from km 35 550 design chainage 0 000) to 42 800 design chainage 8 153 on nh 503.
Read moreImprovement construction of 2 lane with hard shoulder of askote lipulekh road from tawaghat village to budhi village and from end of tunnel to kali mandir
Improvement or construction of 2 lane with hard shoulder of askote lipulekh road from tawaghat village to budhi village design km 56 pt 935 to km 95 pt 748 and from end of tunnel portal to kali mandir design km 113 pt 828 to km 133 pt 078
Read moreConsultancy services for ae for supervision of bypass to narsapuram town on nh216 of 2 lane with paved shoulder configuration, ing from e ch. km 126.100 of nh216 old nh214a and ending at km 10.814 existing chainage of nh216 in the state of ap
Consultancy services for ae for supervision of bypass to narsapuram town on nh216 of 2 lane with paved shoulder configuration, ing from e ch. km 126.100 of nh216 old nh214a and ending at km 10.814 existing chainage of nh216 in the state of ap
Read moreConstruction of missing link from birhu to lathiani into 4-lane and paved shoulder configuration from km 35.550 design chainage 0.000 to 42.800 design chainage 8.153 on nh 503a including cable stayed bridge 0.860 km on back water of govind sagar
Construction of missing link from birhu to lathiani into 4-lane and paved shoulder configuration from km 35.550 design chainage 0.000 to 42.800 design chainage 8.153 on nh 503a including cable stayed bridge 0.860 km on back water of govind sagar
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreConsultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat
Consultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat
Read moreUp gradation to two four lane with paved shoulder configuration of nh 652 from tuljapur naldurge akkalkot road chainage from km 00.000 to km 30.982 in the state of maharashtra on epc mode length 30.982km
Up gradation to two four lane with paved shoulder configuration of nh 652 from tuljapur naldurge akkalkot road chainage from km 00.000 to km 30.982 in the state of maharashtra on epc mode length 30.982km
Read moreof your Industry type