Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Construction Of 2 Lane With Hard Shoulder Of Askote Lipulekh Road From Tawaghat Village To Budhi Village And From End Of Tunnel To Kali Mandir
|
| Description |
Improvement Or Construction Of 2 Lane With Hard Shoulder Of Askote Lipulekh Road From Tawaghat Village To Budhi Village Design Km 56 Pt 935 To Km 95 Pt 748 And From End Of Tunnel Portal To Kali Mandir Design Km 113 Pt 828 To Km 133 Pt 078
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_740109_2 |
|
Reference Number |
90002/Tawaghat-Kalimandir/EPC |
| Tender Fee | 35400 |
| EMD | 2.75 Crore |
| Tender Value | - |
| Place | HQ Project Hirak |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 24, 2023 15:30 |
| End Date |
Expired
18/09/2023
Expired 1122 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hard shoulder and interlocking block pavement work from kherwara side pkg4 end point to do nadi pool and do nadi pool to dungarpur and tijwad to nh-927a pkg-4 merging point at km 168/600 to 170/600
Hard shoulder and interlocking block pavement work from kherwara side pkg4 end point to do nadi pool and do nadi pool to dungarpur and tijwad to nh-927a pkg-4 merging point at km 168/600 to 170/600
Read moreConsultancy services for authority engineer for supervision of construction of 2 lane with hard shoulder on askote lipulekh road nh 09 between km 56pt935 to km 95pt748 and km 113pt828 to km 133pt078 under project hirak and bharatmala pariyojana
Consultancy services for authority engineer for supervision of construction of 2 lane with hard shoulder on askote lipulekh road nh 09 between km 56pt935 to km 95pt748 and km 113pt828 to km 133pt078 under project hirak and bharatmala pariyojana
Read moreWidening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode
Widening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode
Read moreWidening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode
Widening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode
Read moreConstruction of lane with tile work from ward no 6 pyt budhi north to kali mata mandir road behind budhi cricket ground
Construction of lane with tile work from ward no 6 pyt budhi north to kali mata mandir road behind budhi cricket ground
Read moreConsultancy services for authority engineer for supervision of widening to 2 lane with hard shoulder configuration of kali mandir chainage km 133pt078 and lipulekh chainage km 159pt476 road of nh 09 under project hirak of bro in state of uttarakhand
Consultancy services for authority engineer for supervision of widening to 2 lane with hard shoulder configuration of kali mandir chainage km 133pt078 and lipulekh chainage km 159pt476 road of nh 09 under project hirak of bro in state of uttarakhand
Read moreConstruction of proposed 4-lane/ 2-lane internal road (with hard shoulder on each side) inside arang industrial area in khordha dist., odisha.
Construction of proposed 4-lane/ 2-lane internal road (with hard shoulder on each side) inside arang industrial area in khordha dist., odisha.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to km 273/80 and widening end to end and improvements from km 271/3 to 273/0 of nh-948 (coimbatore - sathyamangalam road) (length 5.40 km) incl
Widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to km 273/80 and widening end to end and improvements from km 271/3 to 273/0 of nh-948 (coimbatore - sathyamangalam road) (length 5.40 km) incl
Read moreCutting, uprooting and removal of trees for the work of widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 km 273/00 to km 273/80 and widening end to end improvements from km 271/3 to 273/0 of nh-948 (c
Cutting, uprooting and removal of trees for the work of widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 and km 273/00 to km 273/80 and widening end to end andimprovements from km 271/3 to 273/0 of nh-948
Read moreof your Industry type