Improvement Construction Of 2 Lane With Hard Shoulder Of Askote Lipulekh Road From Tawaghat Village To Budhi Village And From End Of Tunnel To Kali Mandir
Description
Improvement Or Construction Of 2 Lane With Hard Shoulder Of Askote Lipulekh Road From Tawaghat Village To Budhi Village Design Km 56 Pt 935 To Km 95 Pt 748 And From End Of Tunnel Portal To Kali Mandir Design Km 113 Pt 828 To Km 133 Pt 078
Organisation Central Public Procurement Portal 1
Tender Id 2023_MoRTH_740109_2
Reference
Number
90002/Tawaghat-Kalimandir/EPC
Tender Fee 35400
EMD 2.75 Crore
Tender Value -
Place HQ Project Hirak
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date July 24, 2023 15:30
End Date
Expired 18/09/2023

Expired 1122 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Hard shoulder and interlocking block pavement work from kherwara side pkg4 end point to do nadi pool and do nadi pool to dungarpur and tijwad to nh-927a pkg-4 merging point at km 168/600 to 170/600

Hard shoulder and interlocking block pavement work from kherwara side pkg4 end point to do nadi pool and do nadi pool to dungarpur and tijwad to nh-927a pkg-4 merging point at km 168/600 to 170/600

Read more
Consultancy services for authority engineer for supervision of construction of 2 lane with hard shoulder on askote lipulekh road nh 09 between km 56pt935 to km 95pt748 and km 113pt828 to km 133pt078 under project hirak and bharatmala pariyojana

Consultancy services for authority engineer for supervision of construction of 2 lane with hard shoulder on askote lipulekh road nh 09 between km 56pt935 to km 95pt748 and km 113pt828 to km 133pt078 under project hirak and bharatmala pariyojana

Read more
Widening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode

Widening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode

Read more
Widening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode

Widening to 2 lane with hard shoulder configuration of kali mandir (chainage km 133 pt 078) and lipulekh (chainage km 159 pt 476) road of nh-09 under bharatmala pariyojna in the state of uttarakhand on epc mode

Read more
Construction of lane with tile work from ward no 6 pyt budhi north to kali mata mandir road behind budhi cricket ground

Construction of lane with tile work from ward no 6 pyt budhi north to kali mata mandir road behind budhi cricket ground

Read more
Consultancy services for authority engineer for supervision of widening to 2 lane with hard shoulder configuration of kali mandir chainage km 133pt078 and lipulekh chainage km 159pt476 road of nh 09 under project hirak of bro in state of uttarakhand

Consultancy services for authority engineer for supervision of widening to 2 lane with hard shoulder configuration of kali mandir chainage km 133pt078 and lipulekh chainage km 159pt476 road of nh 09 under project hirak of bro in state of uttarakhand

Read more
Construction of proposed 4-lane/ 2-lane internal road (with hard shoulder on each side) inside arang industrial area in khordha dist., odisha.

Construction of proposed 4-lane/ 2-lane internal road (with hard shoulder on each side) inside arang industrial area in khordha dist., odisha.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to km 273/80 and widening end to end and improvements from km 271/3 to 273/0 of nh-948 (coimbatore - sathyamangalam road) (length 5.40 km) incl

Widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to km 273/80 and widening end to end and improvements from km 271/3 to 273/0 of nh-948 (coimbatore - sathyamangalam road) (length 5.40 km) incl

Read more
Cutting, uprooting and removal of trees for the work of widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 km 273/00 to km 273/80 and widening end to end improvements from km 271/3 to 273/0 of nh-948 (c

Cutting, uprooting and removal of trees for the work of widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 and km 273/00 to km 273/80 and widening end to end andimprovements from km 271/3 to 273/0 of nh-948

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise