Tender Details

Particulars Details
Title
Rehabilitation And Upgradation From 2 Lane To Four Lane Of Muddanur To B. Kothapalli Section Of Nh 716 G From Km. 0.000 To Km. 56.500 Km In The State Of Andhra Pradesh On Epc Mode.
Description
Rehabilitation And Upgradation From 2 Lane To Four Lane Of Muddanur To B. Kothapalli Section Of Nh 716 G From Km. 0.000 To Km. 56.500 Km In The State Of Andhra Pradesh On Epc Mode.
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2023_MoRTH_779245_1
Reference
Number
-
Tender Fee 1.06 Lakh
EMD 8.5 Crore
Tender Value -
Place Andhra Pradesh
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=819080

Start Date November 02, 2023 23:05
End Date
Expired 15/03/2024

Expired 943 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Read more
Upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode

Upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode

Read more
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis

Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis

Read more
Consultancy services for ae for supervision of rehabilitation and upgradation from km. 0.000 to km. 51.600 of nh321g (agra (junction on nh509 at tedhi baghia) to nuhkhas) to 2 lane with ps configuration in the state of uttar pradesh on epc mode.

Consultancy services for ae for supervision of rehabilitation and upgradation from km. 0.000 to km. 51.600 of nh321g (agra (junction on nh509 at tedhi baghia) to nuhkhas) to 2 lane with ps configuration in the state of uttar pradesh on epc mode.

Read more
Sitc, o and m of ccms for street lighting on four lane ahmedabad dholera expressway ne-08 (km 0.000 to km 109.019) on epc and four lane ahmedabad to godhra section of nh 47 on dbfot in the state of gujarat under piu ahmedabad on 5 year contract basis

Sitc, o and m of ccms for street lighting on four lane ahmedabad dholera expressway ne-08 (km 0.000 to km 109.019) on epc and four lane ahmedabad to godhra section of nh 47 on dbfot in the state of gujarat under piu ahmedabad on 5 year contract basis

Read more
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Read more
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Read more
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.

Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.

Read more
Rehabilitation and upgradation of exist 2l to 4l of nh146 from km 0.000 km 158.600 near berkheri vill to km 23.423 km 181.800 near lehdara vill in the state of madhya pradesh on epc mode tl 23.423 km

Rehabilitation and upgradation of exist 2l to 4l of nh146 from km 0.000 km 158.600 near berkheri vill to km 23.423 km 181.800 near lehdara vill in the state of madhya pradesh on epc mode tl 23.423 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise