Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🛣️ Epc Tender For Paved Shoulder And Surfacing Work On Nh 117 A 🛣️ The Ministry Of Road Transport And Highways, Under The Central Government, Has Issued A Tender For The Execution Of Paved Shoulder And Surfacing With Bituminous Concrete (Bc) On National Highway 117 A (Nh 117 A) From Km 24.60 (Kokrajhar) To Km 39.847 (Karigaon), Covering A Total Length Of 15.247 Km, Under The Abhayapuri Construction Division In The State Of Assam. This Is An Engineering, Procurement, And Construction (Epc) Job, With Job Number 117 A/As/2023 24/254. 📅 Bid Submission Deadline: August 01, 2024, 2:00 Pm Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 30,84,000 Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Tender Documents And Specifications. Keywords: Epc Tender, Road Construction, Bituminous Concrete, National Highway, Ministry Of Road Transport And Highways, Assam, Infrastructure Project, Government TenderParticulars | Details |
---|---|
Title |
Providing Paved Shoulder And Surfacing With Bc Of Nh 117 A Under Ap 2023 24 From Km 24.60(kokrajhar) To Km 39.847(karigaon)(Total Length 15.247 Km) Under Abhayapuri Construction Division In The State Of Assam.(Epc Job No.117 A/As/2023 24/254)
|
Description |
Providing Paved Shoulder And Surfacing With Bc Of Nh 117 A Under Ap 2023 24 From Km 24.60(kokrajhar) To Km 39.847(karigaon)(Total Length 15.247 Km) Under Abhayapuri Construction Division In The State Of Assam.(Epc Job No.117 A/As/2023 24/254)
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2024_MoRTH_814545_1 |
Reference Number |
NHR.38/2023/10 Dated, Guwahati the 2nd July/2024 |
Tender Fee | 10000 |
EMD | 30.84 Lakh |
Tender Value | |
Place | Kokrajhar |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=856012 |
Start Date | July 02, 2024 21:30 |
End Date |
01/08/2024 ( Expired 332 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreShort term maintenance of nh-627, (gaspara to hakram) from km-16.00 to km-22.00 and km- 31.00 to km-62.900 (total length 38.90 km) of nh-627, under bakulia nh division diphu, in the state of assam for the year 2025-26
Short term maintenance of nh-627, (gaspara to hakram) from km-16.00 to km-22.00 and km- 31.00 to km-62.900 (total length 38.90 km) of nh-627, under bakulia nh division diphu, in the state of assam for the year 2025-26
Read moreShort term maintenance contract to nh-127 c for the year 2025-26 from chainage 0.00 to chainage 15.00 (length 15.00 km) under abhayapuri construction division, abhayapuri in the state of assam.
Short term maintenance contract to nh-127 c for the year 2025-26 from chainage 0.00 to chainage 15.00 (length 15.00 km) under abhayapuri construction division, abhayapuri in the state of assam.
Read moreUpgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreConstruction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read moreReconstruction of existing pavement to two lane with paved shoulder of two lcs rbk-24 from km 160.121 to km 161.861 andrbk-26fromkm 163.768 to km 165.568 of nh 75-e (new nh 20) under special repair in the state of jharkhand on epc mode
Reconstruction of existing pavement to two lane with paved shoulder of two lcs rbk-24 from km 160.121 to km 161.861 andrbk-26fromkm 163.768 to km 165.568 of nh 75-e (new nh 20) under special repair in the state of jharkhand on epc mode
Read morePerformance based maintenance contract (pbmc) to nh-61(new nh-2) from km 240.000 (assam nagaland border) to km 257.469 (jhanji tiniali) (total length 17.469 km) (job. no. pbmc/02/as/2024-25/280)
Performance based maintenance contract (pbmc) to nh-61(new nh-2) from km 240.000 (assam nagaland border) to km 257.469 (jhanji tiniali) (total length 17.469 km) (job. no. pbmc/02/as/2024-25/280)
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreof your Industry type