Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 4 Lane Thiruvarur Bypass (Km 15.900 Km 30.836) In Nagapattinam Thanjavur Section Of Nh83 In Tamil Nadu On Hybrid Annuity Mode (Project Length 14.936 Km)
|
| Description |
Construction Of 4 Lane Thiruvarur Bypass (Km 15.900 Km 30.836) In Nagapattinam Thanjavur Section Of Nh83 In Tamil Nadu On Hybrid Annuity Mode (Project Length 14.936 Km)
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_245550_1 |
|
Reference Number |
TNDIV-20020/ 58/2025-Tamil Nadu Division |
| Tender Fee | 70000 |
| EMD | 6.28 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=280738 |
| Start Date | August 18, 2025 20:40 |
| End Date |
Expired
30/10/2025
Expired 352 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 2 robs (129a and 134a) on the bypassed section of thiruvarur town in the nagapattinam thanjavur section of nh 83 in tamil nadu on epc mode
Construction of 2 robs (129a and 134a) on the bypassed section of thiruvarur town in the nagapattinam thanjavur section of nh 83 in tamil nadu on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreUpgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Read moreConsultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Consultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Read moreIndependent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Independent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Read moreConstruction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Construction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Read moreIe services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Ie services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Read moreCons of 6 lane access controlled amaravati outer ring road from kanchikacherla to nandigama on hybrid annuity mode in the state of andhra pradesh. package 1 (km. 189.000 to 189.930 and from km.0.000 to km.27.000)
Cons of 6 lane access controlled amaravati outer ring road from kanchikacherla to nandigama on hybrid annuity mode in the state of andhra pradesh. package 1 (km. 189.000 to 189.930 and from km.0.000 to km.27.000)
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreConstruction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Construction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Read moreof your Industry type