Tender Details

Particulars Details
Title
Aluminium Packing Strip Of Size: Length 600 Mm
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106511694
Reference
Number
LH247155
Tender Fee 0
EMD 0
Tender Value
Place Secunderabad
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/112024/106511694/viewNitPdf_4757921.pdf

Start Date October 28, 2024 22:09
End Date
Expired 19/11/2024

Expired 594 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Sponge eva cellular strip size thickness

For complete deion and other details, please refer to tender

Read more
Provn of view cutter of size 90 mtr length and 8 ft height at panchjanya auditorium under ge dronachal

Provn of view cutter of size 90 mtr length and &#x0d 8 ft height at panchjanya auditorium under ge &#x0d dronachal

Read more
Providing, laying and compaction of wbm 75 mm thick (in two layers), wbm 100 mm thick, sand blanketing 30 mm thick, ilcb 80 mm thick of m-50 gr concrete and edge block with pcc m 30 gr concrete bet km 44.180 to km 52.000 on lungro gg-damteng-yangts

Providing, laying and compaction of wbm 75 mm thick (in two layers), wbm 100 mm thick, sand blanketing 30 mm thick, ilcb 80 mm thick of m-50 gr concrete and edge block with pcc m 30 gr concrete bet km 44.180 to km 52.000 on lungro gg-damteng-yangts

Read more
Laying of 80 mm, 100mm pipeline near durgapur press club under dmc

Laying of 80 mm, 100mm pipeline near durgapur press club under dmc

Read more
Repair/replacement of pump motor of various size and various types starter and misc works at stn under ge (af) chabua

Repair/replacement of pump motor of various size and various types starter and misc works at stn under ge (af) chabua

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
P and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region

P and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)

Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, &#x0d (length - 27.00 km)&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise