Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Work Shifting Of 11 Kv And Lt Line Along Proposed Ring Road From Lucknow Varansi Road To Jail Road Via Devikhera Road
|
Description |
Work Shifting Of 11 Kv And Lt Line Along Proposed Ring Road From Lucknow Varansi Road To Jail Road Via Devikhera Road
|
Organisation | Chief Engineer Electrical Mechanical PWD Lucknow | State Govt. and UT |
Tender Id | 2025_CEEMP_1026853_1 |
Reference Number |
754/4CBW-17EM/2025 Date 09-04-2025 |
Tender Fee | 2354 |
EMD | 5.4 Lakh |
Tender Value | |
Place | Lucknow |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1855525 |
Start Date | April 11, 2025 15:30 |
End Date |
28/04/2025 ( Expired 71 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreSitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreConstruction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Construction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Read moreConstruction of c.c. road from shiv maharaj to rajput house and rajaram rajak house to mani shrivastava house in ward no. 09, nagar parishad, tendukheda
Construction of c.c. road from shiv maharaj to rajput house and rajaram rajak house to mani shrivastava house in ward no. 09, nagar parishad, tendukheda
Read moreof your Industry type