Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening / Overlaying And Maintenance Of The Existing Bituminous Surface From Km 0.000 To Km 38.000 Of Dindigul Nattham Section Of Nh 383 In The State Of Tamil Nadu On Item Rate Basis
|
| Description |
Strengthening / Overlaying And Maintenance Of The Existing Bituminous Surface From Km 0.000 To Km 38.000 Of Dindigul Nattham Section Of Nh 383 In The State Of Tamil Nadu On Item Rate Basis
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_245335_1 |
|
Reference Number |
NHAI/17011/01/128/2025/RO Madurai |
| Tender Fee | 10000 |
| EMD | 42 Lakh |
| Tender Value | - |
| Place | Dindigul - Nattham |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=280441 |
| Start Date | August 14, 2025 21:20 |
| End Date |
Expired
27/09/2025
Expired 385 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis
Strengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis
Read moreMajor maintenance through strengthening and overlay of the existing highway from km.38.000 (guduvancherry) to km.51.300 (mahindra city) on tambaram to tindivanam section of nh 32 (old nh 45) in the state of tamil nadu on item rate (percentage) basis
Major maintenance through strengthening and overlay of the existing highway from km.38.000 (guduvancherry) to km.51.300 (mahindra city) on tambaram to tindivanam section of nh 32 (old nh 45) in the state of tamil nadu on item rate (percentage) basis
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreStrengthening / overlaying and maintenance of the existing bituminous surface from km 0.000 to km 38.000 and re-establishment of the entire toll plaza of nh-383 (dindigul - natham section) in the state of tamil nadu on item rate (percentage) basis
Strengthening / overlaying and maintenance of the existing bituminous surface from km 0.000 to km 38.000 and re-establishment of the entire toll plaza of nh-383 (dindigul - natham section) in the state of tamil nadu on item rate (percentage) basis
Read moreConsultancy services for preparation of detailed project report (dpr) for four laning of dindigul - nattham section from km 0.000 to km 38.000 (tentative design length 38.000 km) of nh-383 in the state of tamil nadu
Consultancy services for preparation of detailed project report (dpr) for four laning of dindigul - nattham section from km 0.000 to km 38.000 (tentative design length 38.000 km) of nh-383 in the state of tamil nadu
Read moreConsultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu
Read moreStrengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Read moreS/r to nh-157 such as overlaying bituminous concrete over existing bt surface within km 89/786 to 90/600 km for the year 2023-24.
Civil works
Read moreStrengthening / overlaying and maintenance of the existing bituminous surface including re-establishment of the entire perali toll plaza in thanjavur - perambalur - attur section of nh-136 in the state of tamil nadu on item rate (percentage) basis
Strengthening / overlaying and maintenance of the existing bituminous surface including re-establishment of the entire perali toll plaza in thanjavur - perambalur - attur section of nh-136 in the state of tamil nadu on item rate (percentage) basis
Read moreProviding 40mm bc overlaying over damaged bituminous surface from km.35.00 to 38.00 of nh326a for the year 202324
Providing 40mm bc overlaying over damaged bituminous surface from km 35.00 to 38.00 of nh326a for the year 202324
Read moreof your Industry type