Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Work Of Nh 215 From Km 0.000 To Km 47.550 Of Total Length 47.550 Km Under Epc Mode For The Year 2023 24 Under Nh(o) Annual Plan 2023 24
|
| Description |
Strengthening Work Of Nh 215 From Km 0.000 To Km 47.550 Of Total Length 47.550 Km Under Epc Mode For The Year 2023 24 Under Nh(o) Annual Plan 2023 24
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_797611_1 |
|
Reference Number |
Tender/Annual Plan/2023-24/NH(O)/8 |
| Tender Fee | 10000 |
| EMD | 52.98 Lakh |
| Tender Value | - |
| Place | Km 0.000 to Km 47.550 of NH-215 |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=838396 |
| Start Date | February 27, 2024 00:25 |
| End Date |
Expired
11/03/2024
Expired 946 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreSc services during onm stage of 2lps of karauli dholpur section of nh 23, and 2lps of uncha nagla khanuan roopvas dholpur section of nh-123 in the on epc mode. (total length 175.908 km.)
Sc services during onm stage of 2lps of karauli dholpur section of nh 23, and 2lps of uncha nagla khanuan roopvas dholpur section of nh-123 in the on epc mode. (total length 175.908 km.)
Read moreStrengthening work from 0.00 (paswan chowk) to 58.450 (musharigharari) of nh 103 (new nh 322) on epc mode in state of bihar repair on risk and cost.
Strengthening work from 0.00 (paswan chowk) to 58.450 (musharigharari) of nh 103 (new nh 322) on epc mode in state of bihar repair on risk and cost.
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreConstruction of flyover for long-term rectification of morth notified accident blackspot at palasi zero mile more, nh-27 km 212.000/nh-527 km 0.000, araria district, bihar on epc mode
Construction of flyover for long-term rectification of morth notified accident blackspot at palasi zero mile more, nh-27 km 212.000/nh-527 km 0.000, araria district, bihar on epc mode
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreAuthority engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 lada to bameng 0.000 to 43.65 43.65 km on epc mode
Authority engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 lada to bameng 0.000 to 43.65 43.65 km on epc mode
Read moreWhite topping of existing internal road of dhule city length 8 00 km bypassed section of nh 53 in the state of maharashtra on epc mode
White topping of existing internal road of dhule city length 8 00 km bypassed section of nh 53 in the state of maharashtra on epc mode
Read moreof your Industry type