Tender Details

Particulars Details
Title
Laying Of Rcc Pipe Line For Filling Of Village Pond Baba Wala Pond In Koharar Off Taking From Km 1.530 Of Chirya Disty
Description
Laying Of Rcc Pipe Line For Filling Of Village Pond Baba Wala Pond In Koharar Off Taking From Km 1.530 Of Chirya Disty
Organisation Haryana Government | State Govt. and UT
Tender Id 2024_HRY_388834_1
Reference
Number
2024F5721807 222B 4FE8 AE05 4555065F55E8140IRR
Tender Fee 2180
EMD 18160
Tender Value
Place Charkhi Dadri
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=464996

Start Date July 10, 2024 22:30
End Date
Expired 19/07/2024

Expired 732 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh

Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh

Read more
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Supervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb

Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Laying of rcc pipe line for filling of village pond baba wala pond in koharar off taking from km 1.530 of chirya disty

Laying of rcc pipe line for filling of village pond baba wala pond in koharar off taking from km 1.530 of chirya disty

Read more
Laying of rcc pipe line for...

Laying of rcc pipe line for filling of village pond baba wala pond in koharar off taking from km 1.530 of chirya disty

Read more
Laying of rcc pipe line for filling of village pond (picholia pond) in jholri village off taking at km 7.810 of chirya disty..

Laying of rcc pipe line for filling of village pond (picholia pond) in jholri village off taking at km 7.810 of chirya disty..

Read more
Laying of rcc pipe line for filling of village pond (picholia pond) in jholri village off taking at km 7.810 of chirya disty..

Laying of rcc pipe line for filling of village pond (picholia pond) in jholri village off taking at km 7.810 of chirya disty..

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise