Tender Details

Particulars Details
Title
Balance Works Of 4 Lane Divided Carriageway Of Missing Link Section Of Nh 39 (Rewa Bypass) From Junction With Nh 30 Near Bela To Junction With Mprdc Ring Road Near Silpara On Sh 9 (Length 13.100 Km) On Epc Mode Under Bmp In Madhya Pradesh
Description
Balance Works Of 4 Lane Divided Carriageway Of Missing Link Section Of Nh 39 (Rewa Bypass) From Junction With Nh 30 Near Bela To Junction With Mprdc Ring Road Near Silpara On Sh 9 (Length 13.100 Km) On Epc Mode Under Bmp In Madhya Pradesh
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_169607_1
Reference
Number
NHAI/HQ/MP/NH-39/ BalanceRewaMissingLink/2023
Tender Fee 30000
EMD 2.39 Crore
Tender Value
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in

Start Date October 05, 2023 14:45
End Date
Expired 30/11/2023

Expired 938 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Construction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Construction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Upgradation of old nh-7 from 2-lane to 4-lane divided carriageway in seoni town for a length of 12.67 km. and construction of new rob for a length of 630m (approx.) in seoni town in the state of madhya pradesh on epc mode.

Upgradation of old nh-7 from 2-lane to 4-lane divided carriageway in seoni town for a length of 12.67 km. and construction of new rob for a length of 630m (approx.) in seoni town in the state of madhya pradesh on epc mode.

Read more
New construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

New construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Read more
Balance work of widening and upgradation to two lane with paved shoulders of pawai-saleha-jasso-nagod section of nh-943 (length - 12.49 km) in the state of madhya pradesh on epc mode.

Balance work of widening and upgradation to two lane with paved shoulders of pawai-saleha-jasso-nagod section of nh-943 (length - 12.49 km) in the state of madhya pradesh on epc mode.

Read more
Construction of 4 lane western bypass of gwalior from km 0.000 to km 28.800 in the state of madhya pradesh on epc mode under nh(o) scheme

Construction of 4 lane western bypass of gwalior from km 0.000 to km 28.800 in the state of madhya pradesh on epc mode under nh(o) scheme

Read more