Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Works Of 4 Lane Divided Carriageway Of Missing Link Section Of Nh 39 (Rewa Bypass) From Junction With Nh 30 Near Bela To Junction With Mprdc Ring Road Near Silpara On Sh 9 (Length 13.100 Km) On Epc Mode Under Bmp In Madhya Pradesh
|
| Description |
Balance Works Of 4 Lane Divided Carriageway Of Missing Link Section Of Nh 39 (Rewa Bypass) From Junction With Nh 30 Near Bela To Junction With Mprdc Ring Road Near Silpara On Sh 9 (Length 13.100 Km) On Epc Mode Under Bmp In Madhya Pradesh
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NHAI_169607_1 |
|
Reference Number |
NHAI/HQ/MP/NH-39/ BalanceRewaMissingLink/2023 |
| Tender Fee | 30000 |
| EMD | 2.39 Crore |
| Tender Value | |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | October 05, 2023 14:45 |
| End Date |
Expired
30/11/2023
Expired 938 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreConstruction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreUpgradation of old nh-7 from 2-lane to 4-lane divided carriageway in seoni town for a length of 12.67 km. and construction of new rob for a length of 630m (approx.) in seoni town in the state of madhya pradesh on epc mode.
Upgradation of old nh-7 from 2-lane to 4-lane divided carriageway in seoni town for a length of 12.67 km. and construction of new rob for a length of 630m (approx.) in seoni town in the state of madhya pradesh on epc mode.
Read moreNew construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
New construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreWidening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Read moreBalance work of widening and upgradation to two lane with paved shoulders of pawai-saleha-jasso-nagod section of nh-943 (length - 12.49 km) in the state of madhya pradesh on epc mode.
Balance work of widening and upgradation to two lane with paved shoulders of pawai-saleha-jasso-nagod section of nh-943 (length - 12.49 km) in the state of madhya pradesh on epc mode.
Read moreConstruction of 4 lane western bypass of gwalior from km 0.000 to km 28.800 in the state of madhya pradesh on epc mode under nh(o) scheme
Construction of 4 lane western bypass of gwalior from km 0.000 to km 28.800 in the state of madhya pradesh on epc mode under nh(o) scheme
Read moreof your Industry type