Tender Details

Particulars Details
Title
Construction Of Interlocking And U Drain In Vianyakpur D.K. Katiyar To Electronic Shop Cornar Both Side Footpath Patri Kanpur Nagar
Description
Construction Of Interlocking And U Drain In Vianyakpur D.K. Katiyar To Electronic Shop Cornar Both Side Footpath Patri Kanpur Nagar
Organisation Department of MSME And Export Promotion | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1180
EMD 20300
Tender Value
Place KANPUR
Link

AAAAAAAAAA

Login to view
Start Date May 07, 2025 19:00
End Date

15/05/2025 ( 4 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of bypass road to rayagada town and jk pur town on nh-326 in the state of odisha.

Construction of bypass road to rayagada town and jk pur town on nh-326 in the state of odisha. &#x0d (bid ref no. 10 ce nh of 2024-25)&#x0d

Read more
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Read more
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Construction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara

Construction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m

Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m

Read more
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise