Tender Details

Particulars Details
Title
Supply Of Labour Men Mazdoor To Attend The Work Of Earth Excavation, Asphalt Cutting, Concrete Refilling, Slab Removal And Re Fixing Of Cast Iron Or Concrete Material At Various Places Of Inside And Out Side Of Port Premises
Description
Supply Of Labour Men Mazdoor To Attend The Work Of Earth Excavation, Asphalt Cutting, Concrete Refilling, Slab Removal And Re Fixing Of Cast Iron Or Concrete Material At Various Places Of Inside And Out Side Of Port Premises
Organisation Central Public Procurement Portal 1
Tender Id 2023_ChPT_760145_1
Reference
Number
MEE/41/2023/Dy.CME(MP and OH)
Tender Fee 0
EMD 13060
Tender Value -
Place O/o The Chief Mechanical Engineer
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date July 12, 2023 16:30
End Date
Expired 24/07/2023

Expired 1181 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Antique light pole with one diffuser led light with 2.7 mtr long cast iron and ms material with nhpc logo as per given specification.,antique light pole with two diffuser led lights with 3.7 mtr long cast iron and ms material with nhpc logo as per given specification.,4 core x 16 sq mm xlpe insulated pvc sheathed aluminum armored power cable of 1100 v grade,hdpe pipe 45 mm,single pole mcb c-series 6 a 240 v 50 hz 10 ka,freight charges,laying of power cable in ground including excavation and refilling,laying and fixing of hdpe pipe along with power cable,erection of pole structure

Antique light pole with one diffuser led light with 2.7 mtr long cast iron and ms material with nhpc logo as per given specification.,antique light pole with two diffuser led lights with 3.7 mtr long cast iron and ms material with nhpc logo as per given specification.,4 core x 16 sq mm xlpe insulated pvc sheathed aluminum armored power cable of 1100 v grade,hdpe pipe 45 mm,single pole mcb c-series 6 a 240 v 50 hz 10 ka,freight charges,laying of power cable in ground including excavation and refilling,laying and fixing of hdpe pipe along with power cable,erection of pole structure

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Supply of labour men mazdoor to attend the work of earth excavation, asphalt cutting, concrete cutting, refilling, slab removal and refixing of cast iron concrete material for a period of 720 mandays for water distribution.

Supply of labour men mazdoor to attend the work of earth excavation, asphalt cutting, concrete cutting, refilling, slab removal and refixing of cast iron concrete material for a period of 720 mandays for water distribution.

Read more
Cleaning grass and removal of building rubbish inside excavation workshop and regional store campus at dipka expansion project of dipka area.

Cleaning grass and removal of building rubbish inside excavation workshop and regional store campus at dipka expansion project of dipka area.

Read more
Work contract for excavation, removal and transportation of ash accumulated inside silos of ph-i at 2x600 mw, sstpp, mppgcl, dongalia.

Work contract for excavation, removal and transportation of ash accumulated inside silos of ph-i at 2x600 mw, sstpp, mppgcl, dongalia.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise