Tender Details

Particulars Details
Title
Laying Of Underground Cable Incl Excavation, Refilling And Removal Of Excess Soil As Per Appendix
Description
Organisation Department of Defence | Ministry of Defence
Tender Id GEM/2024/B/5658110
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date November 28, 2024 01:51
End Date
Expired 18/12/2024

Expired 668 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 90 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Defence
Organisation: Border Road Organisation
Similar Tenders
Removal, repair and reconditioning of existing flower pots at various locations in the city, including refilling with soil-manure mixture, plantation, putty/painting and logo work, proper placement, and supply of new flower pots with plants.

Removal, repair and reconditioning of existing flower pots at various locations in the city, including refilling with soil-manure mixture, plantation, putty/painting and logo work, proper placement, and supply of new flower pots with plants.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Custom bid for services - service contract for removal of sludge materials from the underground settling tank at afd

Custom bid for services - service contract for removal of sludge materials from the underground settling tank at afd

Read more
Soil investigation with provn of 01x underground living bunker for troops of 19th battalion raj rif/ 14 jak rif at uri mil stn.

Soil investigation with provn of 01x underground living bunker for troops of 19th battalion raj rif/ 14 jak rif at uri mil stn.

Read more
Work regarding soil excavation, barricading, and the installation of view cutters for the chhath puja festival at magazine ghat, falling in suterganj under ward-75 zone-04.

Work regarding soil excavation, barricading, and the installation of view cutters for the chhath puja festival at magazine ghat, falling in suterganj under ward-75 zone-04.

Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - cable jointing work including excavation and refilling of earth along with supply of materials of the xlpes ug and aerial bunched cables for rectification of faults unde..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - cable jointing work including excavation and refilling of earth along with supply of materials of the xlpes ug and aerial bunched cables for rectification of faults unde..

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick

Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick

Read more
Custom bid for services - total price for rodent control treatment using approved rodenticide with minimum 4kg rodenticide per operation incl supply of material, placement, labour, equipment, ppe, monitoring etc, qty 72 operations (refer scc, sow & ..,custom bid for services - total price for snake control operation incl inspection, identification, safe removal/relocation, application of snake repellent/chemical, deployment of trained personnel with 3ltrs chemical per operation, qty 72 operati..,custom bid for services - total price for removal of honey bee hives of all sizes at all heights, deployment of scaffolding/crane, using spray pumps, insecticide chemical, safety equipments, labour, using minimum 300ml chemical per operation, qty 100..,custom bid for services - total price for lizard/cockroach/red & black ants/termite control treatment by spraying dimethoate 30 ec solution, using 3ltrs chemical per operation, incl chemical, labour, equipment, ppe and all incidental charges, qty 72..,custom bid f

Custom bid for services - total price for rodent control treatment using approved rodenticide with minimum 4kg rodenticide per operation incl supply of material, placement, labour, equipment, ppe, monitoring etc, qty 72 operations (refer scc, sow & ..,custom bid for services - total price for snake control operation incl inspection, identification, safe removal/relocation, application of snake repellent/chemical, deployment of trained personnel with 3ltrs chemical per operation, qty 72 operati..,custom bid for services - total price for removal of honey bee hives of all sizes at all heights, deployment of scaffolding/crane, using spray pumps, insecticide chemical, safety equipments, labour, using minimum 300ml chemical per operation, qty 100..,custom bid for services - total price for lizard/cockroach/red & black ants/termite control treatment by spraying dimethoate 30 ec solution, using 3ltrs chemical per operation, incl chemical, labour, equipment, ppe and all incidental charges, qty 72..,custom bid f

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise