Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rwd/Ranchi/ 34/ 2024 25 Construction Of Road From Nayatoli Simalia Pull To Different Streets Of Adarsh Nagar Colony (Length 2.47 Km.)
|
| Description |
Rwd/Ranchi/ 34/ 2024 25 Construction Of Road From Nayatoli Simalia Pull To Different Streets Of Adarsh Nagar Colony (Length 2.47 Km.)
|
| Organisation | RWD EinC | State Govt. and UT |
| Tender Id | 2024_RWD_94164_1 |
|
Reference Number |
RWD/RANCHI/ 34/ 2024-25 |
| Tender Fee | 10000 |
| EMD | 5.39 Lakh |
| Tender Value | |
| Place | RANCHI |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=126746 |
| Start Date | September 26, 2024 19:30 |
| End Date |
Expired
04/10/2024
Expired 638 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreSpecial repair to drda chakka to railway station via pattnaik colony chatrapur ganjam road such as pothole repair flank dressing and dressing of shoulder from 0/0 to 1/500 km
Special repair to drda chakka to railway station via pattnaik colony chatrapur ganjam road such as pothole repair flank dressing and dressing of shoulder from 0/0 to 1/500 km
Read moreConstruction of various infrastructures at camp of 48 bn itb police, katihar (bihar) at an altitude of 9320 feet and a distance of approx. 25 km from chungthang, distt-mangan, north sikkim. camp connected by road.
Construction of various infrastructures at camp of 48 bn itb police, katihar (bihar) at an altitude of 9320 feet and a distance of approx. 25 km from chungthang, distt-mangan, north sikkim. camp connected by road.
Read moreConstruction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Read moreRwd/ranchi/ 34/2024-25 construction of road from nayatoli simalia pull to different streets of adarsh nagar colony (length-2.47 km.)
Rwd/ranchi/ 34/2024-25 construction of road from nayatoli simalia pull to different streets of adarsh nagar colony (length-2.47 km.)
Read moreRwd/ranchi/ 35/2024-25 construction of road in different streets of jamaria tola panchayat simalia (length-1.20 km.)
Rwd/ranchi/ 35/2024-25 construction of road in different streets of jamaria tola panchayat simalia (length-1.20 km.)
Read moreRwd/ranchi/ 39/ 2023-24construction of road from nawatoli reo road to different streets of colony behind mixture factory in simalia village panchayat simalia (l-1.15 km.)
Rwd/ranchi/ 39/ 2023-24construction of road from nawatoli reo road to different streets of colony behind mixture factory in simalia village panchayat simalia (l-1.15 km.)
Read moreRwd/ranchi/ 81/ 2024-25 construction of road from jojo nagar chowk to different streets of sarvodaya nagar road no. 1 and 2 nawatoli kids heart school in simalia panchayat (length-3.10 km.)
Rwd/ranchi/ 81/ 2024-25 construction of road from jojo nagar chowk to different streets of sarvodaya nagar road no. 1 and 2 nawatoli kids heart school in simalia panchayat (length-3.10 km.)
Read moreof your Industry type