Particulars | Details |
---|---|
Title |
Laying And Commissioning Of 2nd New Range Of 8 Inch Dia Ms Pipeline For Installation Of 2000 Gpm Pump At New 32 No. Sump To Dhupgarah Nala For Dewatering Of 32 No. Sump For Coal Production From Dakra Seam Under Dakra Project, Nk Area
|
Description |
Laying And Commissioning Of 2nd New Range Of 8 Inch Dia Ms Pipeline For Installation Of 2000 Gpm Pump At New 32 No. Sump To Dhupgarah Nala For Dewatering Of 32 No. Sump For Coal Production From Dakra Seam Under Dakra Project, Nk Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_316312_1 |
Reference Number |
GM (NK)/EnM/e-NIT/2024-25/150 |
Tender Fee | 0 |
EMD | 12800 |
Tender Value | |
Place | Dakra Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=327802 |
Start Date | August 31, 2024 16:30 |
End Date |
10/09/2024 ( Expired 278 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Read moreDismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read moreTransporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Transporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Read more(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
Read moreLowering and fitting of 11 nos of 6inch dia ms pipe and 22 nos of 6inch dia seamless pipe for mini bunker no 30 for the purpose of sand stowing in depillaring district n34 in pit no 8 in rviii nega seam, amkola unit under nimcha colliery
Lowering and fitting of 11 nos of 6inch dia ms pipe and 22 nos of 6inch dia seamless pipe for mini bunker no 30 for the purpose of sand stowing in depillaring district n34 in pit no 8 in rviii nega seam, amkola unit under nimcha colliery
Read moreDismantling of broken stowing pipeline and lowering and fitting of 17 nos of 6 inch dia seamless pipe for bunker no 25 for the purpose of sand stowing in depillaring district nk33 (a) in pit no 7 in rvii narainkuri seam, amkola unit under nimcha
Dismantling of broken stowing pipeline and lowering and fitting of 17 nos of 6 inch dia seamless pipe for bunker no 25 for the purpose of sand stowing in depillaring district nk33 (a) in pit no 7 in rvii narainkuri seam, amkola unit under nimcha
Read moreFor transporting,laying and installation of no. of dia 10 m.s pipe delivery range(falling under non coal bearing area) for total length of 3400 mtr out of which one delivery range will be of length 1600m and another will be of 1800m, including supp
For transporting,laying and installation of no. of dia 10 m.s pipe delivery range(falling under non coal bearing area) for total length of 3400 mtr out of which one delivery range will be of length 1600m and another will be of 1800m, including supp
Read moreLaying of 150mm dia ms/gi 600mtr pipeline for dewatering support at gidi-a quarry no. 3
Laying of 150mm dia ms/gi 600mtr pipeline for dewatering support at gidi-a quarry no. 3
Read moreLaying and erection of 150 mm ms/gi pipeline work at main sump for installation of 01 number 1000 gpm pump of topa project under kuju area.
Laying and erection of 150 mm ms/gi pipeline work at main sump for installation of 01 number 1000 gpm pump of topa project under kuju area.
Read moreRearrangement of 02 nos of pipeline ranges at 32 no sump for preparation of haul road under dakra project.
Rearrangement of 02 nos of pipeline ranges at 32 no sump for preparation of haul road under dakra project.