Tender Details

Particulars Details
Title
Extension Of Existing Pipeline Range And Its Accessories From 32 No Sump To New Working Coal Face For Operation Of 2000 Gpm Pump For Dewatering Of New Sump For Coal Extraction From Dakra Seam Under Dakra Project
Description
Extension Of Existing Pipeline Range And Its Accessories From 32 No Sump To New Working Coal Face For Operation Of 2000 Gpm Pump For Dewatering Of New Sump For Coal Extraction From Dakra Seam Under Dakra Project
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_310296_1
Reference
Number
P.E(ENM)/DBB/eNIT/2024-25/03
Tender Fee 0
EMD 3700
Tender Value -
Place Dakra OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321523

Start Date June 12, 2024 18:30
End Date
Expired 21/06/2024

Expired 844 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing and fixing of different size of coupling nut bolt with double spring washer and rubber bush for smooth operation of pumps installed at main sump (2000 gpm and 1300 gpm), face sump (2000 gpm), mohan nagar pond (500 gpm) under dakra ocp

Providing and fixing of different size of coupling nut bolt with double spring washer and rubber bush for smooth operation of pumps installed at main sump (2000 gpm and 1300 gpm), face sump (2000 gpm), mohan nagar pond (500 gpm) under dakra ocp

Read more
Laying and commissioning of 2nd new range of 8 inch dia ms pipeline for installation of 2000 gpm pump at new 32 no. sump to dhupgarah nala for dewatering of 32 no. sump for coal production from dakra seam under dakra project, nk area

Laying and commissioning of 2nd new range of 8 inch dia ms pipeline for installation of 2000 gpm pump at new 32 no. sump to dhupgarah nala for dewatering of 32 no. sump for coal production from dakra seam under dakra project, nk area

Read more
A)fabrication of bed plate structure for operation of 2000 gpm, make- flowmore pump at face sump under dakra project. b) providing and fixing of ci n.r valve 8 inc dia for installation of 2000 gpm flowmore pump at coal face under dakra project c)prov

A)fabrication of bed plate structure for operation of 2000 gpm, make- flowmore pump at face sump under dakra project. b) providing and fixing of ci n.r valve 8 inc dia for installation of 2000 gpm flowmore pump at coal face under dakra project c)prov

Read more
Providing and fixing of 8 dia flanges, bol nut and washer for operation of 2000 gpm mine dewatering pump at main sump under dakra project, nk area.

Providing and fixing of 8 dia flanges, bol nut and washer for operation of 2000 gpm mine dewatering pump at main sump under dakra project, nk area.

Read more
Dewatering of kalimati seam working in khoodia colliery.

Dewatering of kalimati seam working in khoodia colliery.

Read more
Shifting of 2000 gpm and 4000 gpm pump in the lower side of the sump along with di of its 10in/8in delivery pipeline at jocp sump under abocp mine

Shifting of 2000 gpm and 4000 gpm pump in the lower side of the sump along with di of its 10in/8in delivery pipeline at jocp sump under abocp mine

Read more
Providing and fixing of bearing housing, de and nde of 1000 gpm rkb pump, make kirloskar running at 32 no. sump face under dakra project

Providing and fixing of bearing housing, de and nde of 1000 gpm rkb pump, make kirloskar running at 32 no. sump face under dakra project

Read more
Shifting of 2000 gpm and 4000 gpm pump in the lower side of the sump long with di of its 10inch/8inch dia delivery pipeline at jocp sump under abocp mine

Shifting of 2000 gpm and 4000 gpm pump in the lower side of the sump long with di of its 10inch/8inch dia delivery pipeline at jocp sump under abocp mine

Read more
Providing and fixing of coupling bolt-nut for operation of 1000 gpm rkb and 2000 gpm flomore pumps under dakra project

Providing and fixing of coupling bolt-nut for operation of 1000 gpm rkb and 2000 gpm flomore pumps under dakra project

Read more
Shifting and installation of 6000 gpm 10uph6 pump 10uph8 2000 gpm its pipe shifting at deco coal face and other place of abocp mine under block-ll area

Shifting and installation of 6000 gpm 10uph6 pump 10uph8 2000 gpm its pipe shifting at deco coal face and other place of abocp mine under block-ll area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise