Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Raiganj Kaliyaganj Buniadpur Road (Sh 10 A) Ch. From 35.00 Km. To 55.60 Km. Strengthening Work Under Dakshin Dinajpur Division.
|
| Description |
Raiganj Kaliyaganj Buniadpur Road (Sh 10 A) Ch. From 35.00 Km. To 55.60 Km. Strengthening Work Under Dakshin Dinajpur Division.
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_WBPWD_546871_2 |
|
Reference Number |
WBPWD/SE/NC/NIT_04/2023-24 |
| Tender Fee | |
| EMD | 10 Lakh |
| Tender Value | |
| Place | O/o the S.E., N.C, PWD, Malda |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | July 17, 2023 16:30 |
| End Date |
Expired
18/08/2023
Expired 1050 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read moreRestoration of rain damages on various road under section diggal sub division ramshehar (sh clearance of road side drain in various km
Restoration of rain damages on various road under section diggal sub division ramshehar (sh clearance of road side drain in various km
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreIn the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreCleaning of existing of roadside drains and chilchalling, kutcha drain cutting of road side flanks to facilitate proper drainage of surface water various location of the ghosh para road from 13.00 km to 25.60 km under bkp division during 26-27.sl 02
Read moreImprovement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Improvement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Read morePreparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.
Preparation of detailed project report (dpr)for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.
Read morePreparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.
Preparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.
Read moreof your Industry type