Tender Details

Particulars Details
Title
Preparation Of Detailed Project Report (Dpr) For The Work Widening, Strengthening And Protection Of Raiganj Kaliyaganj Buniadpur Road (Sh 10), Ch. From 4.60 Km. To 22.725 Km. And Ch. From 27.925 Km. To 35.00 Km Under U.D. Division, P.W.D.(2nd Call)
Description
Preparation Of Detailed Project Report (Dpr) For The Work Widening, Strengthening And Protection Of Raiganj Kaliyaganj Buniadpur Road (Sh 10), Ch. From 4.60 Km. To 22.725 Km. And Ch. From 27.925 Km. To 35.00 Km Under U.D. Division, P.W.D.(2nd Call)
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2025_WBPWD_833568_1
Reference
Number
WBPWD/EE/UDD/NIQ-01/2025-26
Tender Fee 0
EMD 5000
Tender Value
Place RAIGANJ
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1857352
Start Date April 09, 2025 19:30
End Date

16/04/2025 ( Expired 4 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Wbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)

Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.

Read more
G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.

G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.

Read more

Barrackpur-barasat (sh-1) road from 0.406 km to 1.991 km, widening works including rcc box drain under barrackpur division in the district of north 24 parganas.. 2nd call

Read more
Consultancy services for preparation of detailed project report for widening and strengthening from km 327.700 to km 413.700 and km 429.700 to km 513.700 on nh-326 in the state of odisha under annual plan 2024-25

Consultancy services for preparation of detailed project report for widening and strengthening from km 327.700 to km 413.700 and km 429.700 to km 513.700 on nh-326 in the state of odisha under annual plan 2024-25

Read more
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.

Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.

Read more
Pmc for preparation of detailed project report, pre construction activity and supervision for the work of widening/upgradation to 4lps from barabanki to lakhimpur of nh727h (except from dewa to fatehpur km 19 000 to km 39 000) in the state of up

Pmc for preparation of detailed project report, pre construction activity and supervision for the work of widening/upgradation to 4lps from barabanki to lakhimpur of nh727h (except from dewa to fatehpur km 19 000 to km 39 000) in the state of up

Read more
Maintenance of road from dm road to halam basti s.b school road from ch.0.00 km to ch.0.50 km total length 0.50 km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling, patch carpeting, seal coating, pucca drain, su

Maintenance of road from dm road to halam basti s.b school road from ch.0.00 km to ch.0.50 km total length 0.50 km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling, patch carpeting, seal coating, pucca drain, su

Read more
Maintenance of road from damcherra to khedacherra road at ch. 27.10 km r s under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of retaining wall, gsb,wbm 3, carpeting, seal coating etc.

Maintenance of road from damcherra to khedacherra road at ch. 27.10 km r s under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of retaining wall, gsb,wbm 3, carpeting, seal coating etc.

Read more
Widening of the road from jalabasa kanchanpur dmc part from ch. 8.22 km to 9.503 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh- excavation, construction of granular sub base, wbm etc.

Widening of the road from jalabasa kanchanpur dmc part from ch. 8.22 km to 9.503 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh- excavation, construction of granular sub base, wbm etc.

Read more
Mtc. of road from rabindranagar to shibnagar at ch 2.25 km under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, plcing of filter media, back fillinh etc. (length 20.10 mtr).

Mtc. of road from rabindranagar to shibnagar at ch 2.25 km under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, plcing of filter media, back fillinh etc. (length 20.10 mtr).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise