Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏗️ Invitation For Bids: Construction Of Rcc Bridge 🌉 The Public Works Department (Pwd), Representing The State Government And Union Territories, Invites Bids From Reputable Contractors For The Proposed Construction Of A Reinforced Cement Concrete (Rcc) Bridge Over The River Srimati At Kaliyaganj, Uttar Dinajpur District. 📅 Bid Submission Deadline: April 15, 2024, 3:00 Pm Earnest Money Deposit (Emd): Inr 10,00,000 Interested Bidders Must Submit Detailed Proposals, Including Technical Capabilities, Financial Viability, And A Comprehensive Project Plan, Adhering To The Specifications Outlined In The Tender Documents. Keywords: Construction, Rcc Bridge, River Srimati, Pwd, State Government And Ut, Infrastructure Project, Bid Submission, EmdParticulars | Details |
---|---|
Title |
Proposed Construction Of Rcc Bridge Over River Srimati On The U/S Side And D/S Side At 27.30 Km On Raiganj Kaliyaganj Buniadpur Road Under Uttar Dinajpur Division, Pwd In The District Of Uttar Dinajpur.
|
Description |
Proposed Construction Of Rcc Bridge Over River Srimati On The U/S Side And D/S Side At 27.30 Km On Raiganj Kaliyaganj Buniadpur Road Under Uttar Dinajpur Division, Pwd In The District Of Uttar Dinajpur.
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_WBPWD_686041_1 |
Reference Number |
WBPWD/SE/NC/NIT_34/2023-24 |
Tender Fee | 0 |
EMD | 10 Lakh |
Tender Value | |
Place | Kaliyaganj |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1494525 |
Start Date | March 22, 2024 16:30 |
End Date |
15/04/2024 ( Expired 430 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Srmd of repair and rehabilitation cable suspension gandhi bridge over siang river loc at km 2.908 on yingkiong moying rd under 105 rcc sector in aor of 761 brtf under project of brahmank in arunachal pradesh
Srmd of repair and rehabilitation cable suspension gandhi bridge over siang river loc at km 2.908 on yingkiong moying rd under 105 rcc sector in aor of 761 brtf under project of brahmank in arunachal pradesh
Read moreConstruction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Construction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Read moreConstruction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand
Construction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand
Read moreConstruction of 65 mtr. span motorable bridge through type with rcc foundation, single lane with 4.75 mtr. carriage - way width over river marsudar at sumbal machna marwah along with the approaches on both sides in district kishtwar under nabard
Construction of 65 mtr. span motorable bridge through type with rcc foundation, single lane with 4.75 mtr. carriage - way width over river marsudar at sumbal machna marwah along with the approaches on both sides in district kishtwar under nabard
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreNagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreConstruction of rcc foot bridge over gomati river near bans bazar at rabindra nagar gp of kathalia rd biock sonamura, sepahijala district during 2023-24(pwd sor r and b 2023)
Construction of rcc foot bridge over gomati river near bans bazar at rabindra nagar gp of kathalia rd biock sonamura, sepahijala district during 2023-24 pwd sor(r and b 2023)
Read moreProv and laying of pqc m40 grade of compacted thickness of 30 cm over dlc m15 grade (pcc 1 2 4) of compacted thickness for const of katra helipad inside 1.10 km fm km 2.500 on katra-reasi road in 69 rcc/35 tf under (p) spk in jk
Prov and laying of pqc m40 grade of compacted thickness of 30 cm over dlc m15 grade (pcc 1 2 4) of compacted thickness for const of katra helipad inside 1.10 km fm km 2.500 on katra-reasi road in 69 rcc/35 tf under (p) spk in jk
Read moreConstruction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Read more04 of ee/rd/phed of 2025-2026
Providing a new setup for drinking water supply of raiganj hospital pwss at raiganj district hospital under raiganj sub-division of uttar dinajpur district under raiganj division phe dte.(tube-well, laying of rising main, laying distribution pipe l
Read moreof your Industry type