Tender Details
Particulars | Details |
---|---|
Title |
Strengthening Of Road From Dalubari To Kamalacharra Via Hrwangkhal Para (L 1.20 Km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall, Cd Etc.
|
Description |
Strengthening Of Road From Dalubari To Kamalacharra Via Hrwangkhal Para (L 1.20 Km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall, Cd Etc.
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_57801_1 |
Reference Number |
130/DNIT/SE-V/AMB/2024-25 |
Tender Fee | 4000 |
EMD | 2.9 Lakh |
Tender Value | |
Place | Ambassa |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58786 |
Start Date | February 01, 2025 21:45 |
End Date |
07/02/2025 ( Expired 122 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Construction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreConstruction of cc road from gandhi chowk to the drain and from gandhi chowk via patel house to kalam house to bajrang mandirat ward no. 04, sirali
Construction of cc road from gandhi chowk to the drain and from gandhi chowk via patel house to kalam house to bajrang mandirat ward no. 04, sirali
Read moreWork of strengthening the damaged road from palwada road to holi chowk via krishna ashram in brajghat
Work of strengthening the damaged road from palwada road to holi chowk via krishna ashram in brajghat&#x0d
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreWidening of service road in mettupalayam side approach of periyanaickenpalayam flyover including land acquisition from km.31/600 to 32/000 of nh-181 (coimbatore - ootty - gundlupet road) - on epc basis contract under annual plan 2024-25 in the stat
Widening of service road in mettupalayam side approach of periyanaickenpalayam flyover including land acquisition from km.31/600 to 32/000 of nh-181 (coimbatore - ootty - gundlupet road) - on epc basis contract under annual plan 2024-25 in the stat
Read moreIrqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26
Irqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26
Read moreof your Industry type