Tender Details
Particulars | Details |
---|---|
Title |
Strengthening Of Road From Dalubari Rail Bridge To Kekmacharra (L 1.10 Km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall, Cd Etc.
|
Description |
Strengthening Of Road From Dalubari Rail Bridge To Kekmacharra (L 1.10 Km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall, Cd Etc.
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_57794_1 |
Reference Number |
126/DNIT/SE-V/AMB/2024-25 |
Tender Fee | 4000 |
EMD | 2.91 Lakh |
Tender Value | |
Place | Ambassa |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58780 |
Start Date | February 01, 2025 21:45 |
End Date |
07/02/2025 ( Expired 121 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Construction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreWidening of service road in mettupalayam side approach of periyanaickenpalayam flyover including land acquisition from km.31/600 to 32/000 of nh-181 (coimbatore - ootty - gundlupet road) - on epc basis contract under annual plan 2024-25 in the stat
Widening of service road in mettupalayam side approach of periyanaickenpalayam flyover including land acquisition from km.31/600 to 32/000 of nh-181 (coimbatore - ootty - gundlupet road) - on epc basis contract under annual plan 2024-25 in the stat
Read moreRepair to culvert, drain cover with ci grating, gates, sign board etc, certain misc works of area-ii and repairs to security wall, boundary wall, fencing of area-ii under age (b/r) central at ge (west) colaba, mumbai
Repair to culvert, drain cover with ci grating, gates, sign board etc, certain misc works of area-ii and repairs to security wall, boundary wall, fencing of area-ii under age (b/r) central at ge (west) colaba, mumbai
Read moreof your Industry type