Tender Details

Particulars Details
Title
Strengthening Of Road From Kma Road To Paijabari Via Daspara From Ch.1.60 Km To Ch.3.28 Km (L 1.68 Km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall , Cd Etc.
Description
Strengthening Of Road From Kma Road To Paijabari Via Daspara From Ch.1.60 Km To Ch.3.28 Km (L 1.68 Km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall , Cd Etc.
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 2025_CEPWD_57847_1
Reference
Number
132/DNIT/SE-V/AMB/2024-25
Tender Fee 4000
EMD 2.91 Lakh
Tender Value -
Place Ambassa
Link
View Original Tender Notice

https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58832

Start Date February 01, 2025 22:15
End Date
Expired 07/02/2025

Expired 615 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Development of road from sonamura boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.251 km to ch. 0.416 km

Development of road from sonamura boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.251 km to ch. 0.416 km

Read more
Development of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km

Development of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km

Read more
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.

Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.

Read more
Development of road from puran bazar to singhicherra beltoli l1.50 km from ch. 0.75 km to ch. 1.50 km under pwd randb khowai subdivision during the year 2026 27 sh gsb, wbm, bm, bc, pucca drain etc. gr 2

Development of road from puran bazar to singhicherra beltoli l1.50 km from ch. 0.75 km to ch. 1.50 km under pwd randb khowai subdivision during the year 2026 27 sh gsb, wbm, bm, bc, pucca drain etc. gr 2

Read more
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.

Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.

Read more
Strengthening of road from kma road to paijabari via daspara from ch.0.00 km to ch. 1.50 km (l-1.50 km)/gsb, wbm-ii, wbm-iii, carpeting road side drain, protection wall , cd etc.

Strengthening of road from kma road to paijabari via daspara from ch.0.00 km to ch. 1.50 km (l-1.50 km)/gsb, wbm-ii, wbm-iii, carpeting road side drain, protection wall , cd etc.

Read more
Strengthening of road from nh-8 to kamalacharra from ch.1.60 km to ch.3.10 km (l-1.50km)/gsb, wbm-ii, wbm-iii, carpeting road side drain, protection wall, cd etc.

Strengthening of road from nh-8 to kamalacharra from ch.1.60 km to ch.3.10 km (l-1.50km)/gsb, wbm-ii, wbm-iii, carpeting road side drain, protection wall, cd etc.

Read more
Mtc. of road from kma road to paijabari road via ambassa phc from ch. 2.10 km to ch. 2.60 km. during the year 2024-25/ sh- grouting, patch repairing, re-carpeting, seal coat, drain etc.

Mtc. of road from kma road to paijabari road via ambassa phc from ch. 2.10 km to ch. 2.60 km. during the year 2024-25/ sh- grouting, patch repairing, re-carpeting, seal coat, drain etc.

Read more
Strengthening of road from nh-8 to kamalacharra from ch.0.00 km to ch.1.50 km (l-1.50km)/gsb, wbm-ii, wbm-iii, carpeting road side drain, protection wall, cd etc.

Strengthening of road from nh-8 to kamalacharra from ch.0.00 km to ch.1.50 km (l-1.50km)/gsb, wbm-ii, wbm-iii, carpeting road side drain, protection wall, cd etc.

Read more
Maintenance of road from kma road to daspara via balaram h.s school (l-2.40km) /sh-wbm-111, carpeting , seal coat , protection wall and road side drain etc from chainage 0.00km to 1 .40 km .

Maintenance of road from kma road to daspara via balaram h.s school (l-2.40km) /sh-wbm-111, carpeting , seal coat , protection wall and road side drain etc from chainage 0.00km to 1 .40 km .

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise