Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Strengthening Of Road From Kma Road To Paijabari Via Daspara From Ch.0.00 Km To Ch. 1.50 Km (L 1.50 Km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall , Cd Etc.
|
Description |
Strengthening Of Road From Kma Road To Paijabari Via Daspara From Ch.0.00 Km To Ch. 1.50 Km (L 1.50 Km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall , Cd Etc.
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_57804_1 |
Reference Number |
131/DNIT/SE-V/AMB/2024-25 |
Tender Fee | 4000 |
EMD | 2.91 Lakh |
Tender Value | |
Place | Ambassa |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58788 |
Start Date | February 01, 2025 21:45 |
End Date |
07/02/2025 ( Expired 143 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreMtc. of ganganagar village road under pwd(rnb) sub-division during the year 2025-26 sh - construction of rcc u shaped road side drain of length 398.00 mtr ch. 0.492 km to 0.890 km
Construction of rcc u shaped road side drain of length 398.00 mtr ch. 0.492 km to 0.890 km
Read moreSpecial repair by providing strengthening of road from sirsa-jamal- nithrana upto rajsthan border road km 0.00 to 29.68 (road id5828 and 5829 ) in sirsa district in sirsa and ellenabad constituency (work programme 2025-26) under head-5054 (group-ii)
.special repair by providing strengthening of road from sirsa-jamal- nithrana upto rajsthan border road km 0.00 to 29.68 (road id5828 and 5829 ) in sirsa district in sirsa and ellenabad constituency (work programme 2025-26) under head-5054 (group-ii)
Read moreConstruction of hl bridge skew 3 span 12m each effective over lissara drain xing bathinda kheowali road to nh64 via jassi sangat phullo jai singh including its approaches road di dismantling and 2 point 5m high rcc retaining wall pmgsy iii
Construction of hl bridge skew 3 span 12m each effective over lissara drain xing bathinda kheowali road to nh64 via jassi sangat phullo jai singh including its approaches road di dismantling and 2 point 5m high rcc retaining wall pmgsy iii
Read moreMtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00
Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00
Read moreMtc of road from jirania market (aa road) to mandwi road via dushmanta narayan para (l 1.77 km) during the year 2025-26 sh patch metalling, grouting, re-carpeting, road side pucca drain and other allied works. (l 1.00 km, ch.0.00 km to ch.1.00 km)
Mtc of road from jirania market (aa road) to mandwi road via dushmanta narayan para (l 1.77 km) during the year 2025-26 sh patch metalling, grouting, re-carpeting, road side pucca drain and other allied works. (l 1.00 km, ch.0.00 km to ch.1.00 km)
Read moreImprovement of riding quality work of jublee chowk (nh-75) to herhanj via nawada (sh-10) road from ch- 2.500 km. to 28.700 km. (total length - 26.200 km.)
Improvement of riding quality work of jublee chowk (nh-75) to herhanj via nawada (sh-10) road from ch- 2.500 km. to 28.700 km. (total length - 26.200 km.)
Read moreImprovement of road from kamjong to phungyar junction via bhungpa khunou (phase-ii) in kamjong district (l-14.00 km)
Improvement of road from kamjong to phungyar junction via bhungpa khunou (phase-ii) in kamjong district (l-14.00 km).
Read moreMtc. of road from khilpara masjid to adipara under matabari block during the year 2025-26/sh-construction of cross drain, toe wall and road side rcc drain etc
Mtc. of road from khilpara masjid to adipara under matabari block during the year 2025-26/sh-construction of cross drain, toe wall and road side rcc drain etc
Read moreof your Industry type