Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Strengthening Of Road From Nh 8 To Kamalacharra From Ch.1.60 Km To Ch.3.10 Km (L 1.50km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall, Cd Etc.
|
Description |
Strengthening Of Road From Nh 8 To Kamalacharra From Ch.1.60 Km To Ch.3.10 Km (L 1.50km)/Gsb, Wbm Ii, Wbm Iii, Carpeting Road Side Drain, Protection Wall, Cd Etc.
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_57798_1 |
Reference Number |
128/DNIT/SE-V/AMB/2024-25 |
Tender Fee | 4000 |
EMD | 2.9 Lakh |
Tender Value | |
Place | Ambassa |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58784 |
Start Date | February 01, 2025 21:45 |
End Date |
07/02/2025 ( Expired 127 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreStrengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreConsrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Consrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Read moreMaintenance of different road from lichubagan to lembucherra and fatikcherra to rangacherra(old nh 108b) during the year 2025-26/sh patch grouting, carpeting, seal coat etc.(l-16.00km)
Maintenance of different road from lichubagan to lembucherra and fatikcherra to rangacherra(old nh 108b) during the year 2025-26/sh patch grouting, carpeting, seal coat etc.(l-16.00km)
Read moreImprovement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Read moreWidening of service road in mettupalayam side approach of periyanaickenpalayam flyover including land acquisition from km.31/600 to 32/000 of nh-181 (coimbatore - ootty - gundlupet road) - on epc basis contract under annual plan 2024-25 in the stat
Widening of service road in mettupalayam side approach of periyanaickenpalayam flyover including land acquisition from km.31/600 to 32/000 of nh-181 (coimbatore - ootty - gundlupet road) - on epc basis contract under annual plan 2024-25 in the stat
Read moreof your Industry type