Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Nh 927 Upgradation Project 🛣️ The National Highways Authority Of India (Nhai), Under The Public Sector Undertakings, Invites Bids For The Upgradation To 4 Laning Of The Jarwal To Bahraich Bypass End Section Of Nh 927 From Km 39.800 To 97.000 (Existing Chainage Km 43.270 To Km 98.155) In Uttar Pradesh On Hybrid Annuity Mode (Ham) Under The Nh(o) Scheme, Package Iii. 📅 Bid Submission Deadline: April 24, 2024, 11:00 Am Tender Fee: Inr 1,00,000 Earnest Money Deposit (Emd): Inr 94,10,000 Interested Bidders Are Requested To Submit Detailed Bids, Including Technical And Financial Proposals, In Compliance With The Specifications And Guidelines Outlined In The Tender Document. Keywords: Nhai, Highway Upgradation, Nh 927, 4 Laning, Ham Mode, Nh(o) Scheme, Bid Invitation, Infrastructure Project, Public Sector Undertaking, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Upgradation To 4 Laning Of Jarwal To Bahraich Bypass End Section Of Nh 927 From Km 39.800 To 97.000 (Existing Chainage Km 43.270 To Km 98.155) In Uttar Pradesh On Ham Modeunder Nh(o) Scheme (Package Iii).
|
| Description |
Upgradation To 4 Laning Of Jarwal To Bahraich Bypass End Section Of Nh 927 From Km 39.800 To 97.000 (Existing Chainage Km 43.270 To Km 98.155) In Uttar Pradesh On Ham Modeunder Nh(o) Scheme (Package Iii).
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_179477_1 |
|
Reference Number |
- |
| Tender Fee | 1 Lakh |
| EMD | 9.41 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196485 |
| Start Date | December 28, 2023 14:30 |
| End Date |
Expired
28/05/2024
Expired 868 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreIe services for four laning section of nh 166 from chokak to sangli (ankali) km. 145.300 to km. 171.133 and shiroli (sangli phata) to chokak from km. 0.00 to km 7.719, between kolhapur sangli, be executed on ham in maharashtra on under nh (o).
Ie services for four laning section of nh 166 from chokak to sangli (ankali) km. 145.300 to km. 171.133 and shiroli (sangli phata) to chokak from km. 0.00 to km 7.719, between kolhapur sangli, be executed on ham in maharashtra on under nh (o).
Read moreEngagement of user fee agency on the basis of competitive bidding through e-tender at paithna fee plaza at km. 17.420 at four laning of rajauli bakhtiyarpur section of nh-31 (new nh-20) from km 101.630 to km. 152.520 (packageiii) on ham in bihar
Engagement of user fee agency on the basis of competitive bidding through e-tender at paithna fee plaza at km. 17.420 at four laning of rajauli bakhtiyarpur section of nh-31 (new nh-20) from km 101.630 to km. 152.520 (packageiii) on ham in bihar
Read moreIndependent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Independent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Read moreIndependent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Read more4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
Read moreIndependent engineer services during operation n maintenance period for 6 laning of baraja to kandili (od 7) and kandili to aluru (od 8) of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Independent engineer services during operation n maintenance period for 6 laning of baraja to kandili (od 7) and kandili to aluru (od 8) of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreCs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Cs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Read moreConstruction of 4 lane bridge at ghagra river with approaches and rob from km. 32.800 to km. 39.800(existing chainage km 34.295 to km 43.270) section of nh-927 in uttar pradesh on epc mode under nh(o) scheme (package-ii).
Construction of 4 lane bridge at ghagra river with approaches and rob from km. 32.800 to km. 39.800(existing chainage km 34.295 to km 43.270) section of nh-927 in uttar pradesh on epc mode under nh(o) scheme (package-ii).
Read moreof your Industry type