About Tender
🛣️ Invitation For Bids: Nh 927 Upgradation Project 🛣️ The National Highways Authority Of India (Nhai), Under The Public Sector Undertakings, Invites Bids For The Upgradation To 4 Laning Of The Barabanki To Ghargra Bridge Section Of Nh 927 From Km 0.000 To 32.800 (Existing Chainage Km 1.720 To Km 34.295) In Uttar Pradesh On Ham Mode Under The Nh(o) Scheme (Package I). 📅 Bid Submission Deadline: April 24, 2024, 11:00 Am Tender Fee: Inr 60,000 Earnest Money Deposit (Emd): Inr 5,51,00,000 Interested Bidders Are Requested To Submit Detailed Bids, Including Technical And Financial Proposals, In Compliance With The Specifications And Guidelines Outlined In The Tender Document. Keywords: Nhai, Highway Upgradation, Nh 927, 4 Laning, Ham Mode, Nh(o) Scheme, Bid, Tender, Infrastructure Development, Public Sector Undertaking| Particulars | Details |
|---|---|
| Title |
Upgradation To 4 Laning Of Barabanki To Ghargra Bridge Section Of Nh 927 From Km 0.000 To 32.800 (Existing Chainage Km 1.720 To Km 34.295) In Uttar Pradesh On Ham Mode Under Nh(o) Scheme (Package I).
|
| Description |
Upgradation To 4 Laning Of Barabanki To Ghargra Bridge Section Of Nh 927 From Km 0.000 To 32.800 (Existing Chainage Km 1.720 To Km 34.295) In Uttar Pradesh On Ham Mode Under Nh(o) Scheme (Package I).
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_179481_1 |
|
Reference Number |
- |
| Tender Fee | 60000 |
| EMD | 5.51 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196487 |
| Start Date | December 28, 2023 14:30 |
| End Date |
Expired
28/05/2024
Expired 873 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreConsultancy services as ie during operation and maintenance for supervision of 4l from madanapalle-pileru (km 0.000-km.55.900), pileru-bhakrapeta (km.55.900-km.74.000) sect. of nh-71 from km.0.000-km.74.000 under bharatmala pariyojana in ap on ham
Consultancy services as ie during operation and maintenance for supervision of 4l from madanapalle-pileru (km 0.000-km.55.900), pileru-bhakrapeta (km.55.900-km.74.000) sect. of nh-71 from km.0.000-km.74.000 under bharatmala pariyojana in ap on ham
Read moreUpgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Read moreEngagement of user fee agency on the basis of competitive bidding through e-tender at paithna fee plaza at km. 17.420 at four laning of rajauli bakhtiyarpur section of nh-31 (new nh-20) from km 101.630 to km. 152.520 (packageiii) on ham in bihar
Engagement of user fee agency on the basis of competitive bidding through e-tender at paithna fee plaza at km. 17.420 at four laning of rajauli bakhtiyarpur section of nh-31 (new nh-20) from km 101.630 to km. 152.520 (packageiii) on ham in bihar
Read moreIe services for four laning section of nh 166 from chokak to sangli (ankali) km. 145.300 to km. 171.133 and shiroli (sangli phata) to chokak from km. 0.00 to km 7.719, between kolhapur sangli, be executed on ham in maharashtra on under nh (o).
Ie services for four laning section of nh 166 from chokak to sangli (ankali) km. 145.300 to km. 171.133 and shiroli (sangli phata) to chokak from km. 0.00 to km 7.719, between kolhapur sangli, be executed on ham in maharashtra on under nh (o).
Read moreStrengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis
Strengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis
Read moreIndependent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Read moreIndependent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Independent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Read moreSupervision consultant for supervision of operation and maintenance o and m works of two four laning of chas ramgarh section on nh 320 old nh 23 from km 0.000 to km 78.125 in the state of jharkhand project length 78.125 km
Supervision consultant for supervision of operation and maintenance o and m works of two four laning of chas ramgarh section on nh 320 old nh 23 from km 0.000 to km 78.125 in the state of jharkhand project length 78.125 km