Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Drain With Cover Slab On Bypass Portion Of Nh 6 (New Nh 49) Passing Through The Keonjhar Township Ing From Keonjhar Bypass Section Of Nh 6 To End Of Keonjhar Bypass Section Of Nh 6 I.E. Up To Malgaon Fly Over From Ch. 6/140 K
|
| Description |
Construction Of Rcc Drain With Cover Slab On Bypass Portion Of Nh 6 (New Nh 49) Passing Through The Keonjhar Township Ing From Keonjhar Bypass Section Of Nh 6 To End Of Keonjhar Bypass Section Of Nh 6 I.E. Up To Malgaon Fly Over From Ch. 6/140 K
|
| Organisation | EIC-CIVIL | State Govt. and UT |
| Tender Id | 2024_EICCL_106435_1 |
|
Reference Number |
Bid Identification No PWDK- 19 / 2024-25. |
| Tender Fee | 10000 |
| EMD | 58600 |
| Tender Value | - |
| Place | Keonjhar |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=514546 |
| Start Date | November 05, 2024 21:30 |
| End Date |
Expired
20/11/2024
Expired 694 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration to keonjhar college approach road, kutcheri chhak-bodapalasa and bypass portion of nh-6 new nh-49 passing through kendujhar township from belda to maligaon flyover damaged by watco to its pre-condition for the year 2026-27.
Restoration to keonjhar college approach road, kutcheri chhak-bodapalasa and bypass portion of nh-6 new nh-49 passing through kendujhar township from belda to maligaon flyover damaged by watco to its pre-condition for the year 2026-27.
Read moreOne time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.
One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.
Read moreConstruction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Read moreConstruction of bypass to narsapuram town on nh 216 of 2 lane with paved shoulder configuration ing from existing ch. km 126.100 of nh 216 old nh 214a and ending at km 10.814 existing chainage of nh 216 in the state of andhra pradesh
Construction of bypass to narsapuram town on nh 216 of 2 lane with paved shoulder configuration ing from existing ch. km 126.100 of nh 216 old nh 214a and ending at km 10.814 existing chainage of nh 216 in the state of andhra pradesh
Read morePreparation of dpr for upgradation/new construction of pehowa-kurukshetra- yamunanagar highway including kuk. bypass ing from nh-152 (at pehowa), connecting mdr-119 and nh-44 (in kuk.) and terminating at nh-344 (in ymn.) in the state of haryana
Preparation of dpr for upgradation/new construction of pehowa-kurukshetra- yamunanagar highway including kuk. bypass ing from nh-152 (at pehowa), connecting mdr-119 and nh-44 (in kuk.) and terminating at nh-344 (in ymn.) in the state of haryana
Read moreInstallation of new highway lights on jind bypass on old nh-71 from km 238.695 to km 307.000 (new nh-352) i.e. jind to punjab/haryana border in the state of haryana.
Installation of new highway lights on jind bypass on old nh-71 from km 238.695 to km 307.000 (new nh-352) i.e. jind to punjab/haryana border in the state of haryana.
Read moreConstruction of 6-lane vup at km. 207.615 (ing point of milak bypass) on nh-530, in district rampur in the state of uttar pradesh on epc mode
Construction of 6-lane vup at km. 207.615 (ing point of milak bypass) on nh-530, in district rampur in the state of uttar pradesh on epc mode
Read moreEngagement of user fee collection agency at jhinjholi tp at nh-344ppackage4 ing from bawana industrial area delhi till sonipat bypass of nh352a at village barwasani sonipat in haryana
Engagement of user fee collection agency at jhinjholi tp at nh-344ppackage4 ing from bawana industrial area delhi till sonipat bypass of nh352a at village barwasani sonipat in haryana
Read moreConsultancy services for preparation of detailed project report for (i) widening of nh-03 from km.49.200 to km.58.85 (ii) construction of pathankot bypass (4-lane) ing from nh-154 at km.5.500 and terminating at nh-44 in the state of punjab
Consultancy services for preparation of detailed project report for (i) widening of nh-03 from km.49.200 to km.58.85 (ii) construction of pathankot bypass (4-lane) ing from nh-154 at km.5.500 and terminating at nh-44 in the state of punjab
Read moreConstruction of 4-lane gauripur bypass ing from km. 852.560 of nh-31 and terminating at km. 862.170 via khudimari pt-ii, fulkumari, charaldanga, sajuakuti, geramari ptiii and meeting at km 862.170 of nh-17(new)/nh-31(old) in assam under epc mode
Construction of 4-lane gauripur bypass ing from km. 852.560 of nh-31 and terminating at km. 862.170 via khudimari pt-ii, fulkumari, charaldanga, sajuakuti, geramari ptiii and meeting at km 862.170 of nh-17(new)/nh-31(old) in assam under epc mode
Read moreof your Industry type