Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bypass To Narsapuram Town On Nh 216 Of 2 Lane With Paved Shoulder Configuration Ing From Existing Ch. Km 126.100 Of Nh 216 Old Nh 214 A And Ending At Km 10.814 Existing Chainage Of Nh 216 In The State Of Andhra Pradesh
|
| Description |
Construction Of Bypass To Narsapuram Town On Nh 216 Of 2 Lane With Paved Shoulder Configuration Ing From Existing Ch. Km 126.100 Of Nh 216 Old Nh 214 A And Ending At Km 10.814 Existing Chainage Of Nh 216 In The State Of Andhra Pradesh
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2023_MoRTH_768943_1 |
|
Reference Number |
|
| Tender Fee | 59000 |
| EMD | 4.2 Crore |
| Tender Value | |
| Place | Andhra Pradesh |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=808341 |
| Start Date | August 29, 2023 17:35 |
| End Date |
Expired
14/03/2024
Expired 859 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for ae for supervision of bypass to narsapuram town on nh216 of 2 lane with paved shoulder configuration, ing from e ch. km 126.100 of nh216 old nh214a and ending at km 10.814 existing chainage of nh216 in the state of ap
Consultancy services for ae for supervision of bypass to narsapuram town on nh216 of 2 lane with paved shoulder configuration, ing from e ch. km 126.100 of nh216 old nh214a and ending at km 10.814 existing chainage of nh216 in the state of ap
Read moreConstruction of paderu bypass km 0.000 to km 13.000 of 2 lane with paved shoulder on nh 516e in the state of andhra pradesh under nh o on epc mode.
Construction of paderu bypass km 0.000 to km 13.000 of 2 lane with paved shoulder on nh 516e in the state of andhra pradesh under nh o on epc mode.
Read moreConstruction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc
Construction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc
Read moreConsultancy services for authoritys engineer for supervision of construction of paderu bypass of 2 lane with paved shoulder configuration on nh 516e in the state of andhra pradesh under nh o on epc mode
Consultancy services for authoritys engineer for supervision of construction of paderu bypass of 2 lane with paved shoulder configuration on nh 516e in the state of andhra pradesh under nh o on epc mode
Read moreWidening of existing road to 2 lane with paved shoulder configuration from km 0.000 to 26.000 and km 45.200 to 59.622 of nh 365bb in the state of andhra pradesh under annual plan 2023-24 on epc mode
Widening of existing road to two lane with paved shoulder configuration from km 0.000 to 26.000 and km 45.200 to 59.622 of nh 365bb in the state of andhra pradesh under annual plan 2023-24 on epc mode
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreConstruction of bypass around giridih town of nh-114a to 2 lane with paved shoulder from km 0.000 to km 23.835 (design chainage) in the state of jharkhand under epc mode
Construction of bypass around giridih town of nh-114a to 2 lane with paved shoulder from km 0.000 to km 23.835 (design chainage) in the state of jharkhand under epc mode
Read moreWidening of chilakaluripet nekarikallu section design chainage 47.000 to 85.080 of nh 167a package ii to 4 lane with paved shoulder configuration in the state of andhra pradesh under annual plan 2022 23
Widening of chilakaluripet nekarikallu section design chainage 47.000 to 85.080 of nh 167a package ii to 4 lane with paved shoulder configuration in the state of andhra pradesh under annual plan 2022 23
Read moreof your Industry type