Tender Details

About Tender

🛣️ Invitation For Consultancy Services: Detailed Project Report For Nh 03 Widening & Pathankot Bypass Construction 🛣️ The Ministry Of Road Transport And Highways, Central Government, Is Seeking Professional Consultancy Services For The Preparation Of A Detailed Project Report (Dpr) For Two Critical Infrastructure Projects In The State Of Punjab: 1. Widening Of National Highway (Nh) 03 From Km. 49.200 To Km. 58.85. 2. Construction Of A 4 Lane Pathankot Bypass, Intersecting With Nh 154 At Km. 5.500 And Terminating At Nh 44. 📅 Bid Submission Deadline: July 22, 2024, 3:00 Pm A Non Refundable Tender Fee Of Inr 5000 Must Be Submitted With The Bid. Interested Consultants Are Requested To Submit Detailed Proposals, Including Their Qualifications, Experience, Methodology, And Financial Bids, To Successfully Undertake The Preparation Of The Dpr. Keywords: Consultancy Services, Detailed Project Report, Nh 03 Widening, Pathankot Bypass Construction, Ministry Of Road Transport And Highways, Government Tender, Infrastructure Project, Punjab State
Particulars Details
Title
Consultancy services for preparation of detailed project report for (i) widening of nh-03 from km.49.200 to km.58.85 (ii) construction of pathankot bypass (4-lane) ing from nh-154 at km.5.500 and terminating at nh-44 in the state of punjab
Description
Consultancy services for preparation of detailed project report for (i) widening of nh-03 from km.49.200 to km.58.85 (ii) construction of pathankot bypass (4-lane) ing from nh-154 at km.5.500 and terminating at nh-44 in the state of punjab
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_810482_1
Reference
Number
RW/CH/PB/DPR/2024
Tender Fee 5000
EMD 0
Tender Value
Place PUNJAB
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=851761
End Date

22/07/2024 ( Expired 1 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for consultant assisting ae for supervision of widening of existing road to 2 lane with ps configuration from km 0.0 to 26.0 and km 45.200 to 59.622 of nh 365bb in the state of andhra pradesh under annual plan 2023-24 on epc mode

Consultancy services for consultant assisting ae for supervision of widening of existing road to 2 lane with ps configuration from km 0.0 to 26.0 and km 45.200 to 59.622 of nh 365bb in the state of andhra pradesh under annual plan 2023-24 on epc mode

Read more
Supervision consultancy services (sc) for operation and maintenance of vaggampalle to dornala t-junction section from km. 293.266 to 359.422 of nh-565 (total length 66.156 km) to 2-lane with paved shoulder in the state of andhra pradesh on pbmc mode.

Supervision consultancy services (sc) for operation and maintenance of vaggampalle to dornala t-junction section from km. 293.266 to 359.422 of nh-565 (total length 66.156 km) to 2-lane with paved shoulder in the state of andhra pradesh on pbmc mode.

Read more
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder in makhu town from km. 170.000 to km. 171.900 including rob at km. 171.387 of nh-54 in the state of punjab on epc mode.

Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder in makhu town from km. 170.000 to km. 171.900 including rob at km. 171.387 of nh-54 in the state of punjab on epc mode.

Read more
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Read more
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Read more
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.

Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.

Read more
Consultancy services for preparation of dpr for construction of 02 lane bridges (adjacent to existing structure) at km146.400 (sharda canal),km 162.905 (sharda river),km 189.225 (ghaghra river)and km 212.724(saryu river)of nh-730 in the state of up.

Consultancy services for preparation of dpr for construction of 02 lane bridges (adjacent to existing structure) at km146.400 (sharda canal),km 162.905 (sharda river),km 189.225 (ghaghra river)and km 212.724(saryu river)of nh-730 in the state of up.

Read more
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Read more
Upgradation of existing road to 4/6 lane with 2 lane service road on both sides and cons. of 8 lane elevated flyover at t1 on single pier (section from alandi phata to khed pkg-ii of nh-60 (from km 28.890 to km 42.100) in mh on bot (toll)

Upgradation of existing road to 4/6 lane with 2 lane service road on both sides and cons. of 8 lane elevated flyover at t1 on single pier (section from alandi phata to khed pkg-ii of nh-60 (from km 28.890 to km 42.100) in mh on bot (toll)

Read more
Upgradation of existing road to 4/6 lane with 2 lane service road on both sides and construction of 8 lane elevated flyover at t1 on single pier (section from nashik phata to alandi phata pkg-i of nh-60 (12.190 to km. 28.890) in mh on bot (toll)

Upgradation of existing road to 4/6 lane with 2 lane service road on both sides and construction of 8 lane elevated flyover at t1 on single pier (section from nashik phata to alandi phata pkg-i of nh-60 (12.190 to km. 28.890) in mh on bot (toll)

Read more

No attachments found

Get customized tender Recommendations for your Enterprise