Tender Details

Particulars Details
Title
Consultancy Services For Preparation Of Detailed Project Report For A) Chandurbazar Bypass On Nh 353 J Length 6.00 Km B) Morshi Byapss On Nh 353 K Length 9.00 Km C) Warud Bypass On Nh 353 K Length 12.00 Km. D) Digras Bypass On Nh 161 A Length 5.00 K
Description
Consultancy Services For Preparation Of Detailed Project Report For A) Chandurbazar Bypass On Nh 353 J Length 6.00 Km B) Morshi Byapss On Nh 353 K Length 9.00 Km C) Warud Bypass On Nh 353 K Length 12.00 Km. D) Digras Bypass On Nh 161 A Length 5.00 K
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_848264_1
Reference
Number
36/EENH/AMT/2024-25, Dt.06/02/2025
Tender Fee 11800
EMD 2 Lakh
Tender Value -
Place Chandur bazar
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=891712

Start Date February 08, 2025 18:30
End Date
Expired 02/04/2025

Expired 562 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.

One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Rehabilitation and upgradation of two lane road with paved shoulders on malegaon missing link section of nh461b from akola naka to junction with nh 161 at malegaon bypass (from km 0.00 to 3.00 total length 3.00 km) and 0.00 to 0.460 length of nh753c

Rehabilitation and upgradation of two lane road with paved shoulders on malegaon missing link section of nh461b from akola naka to junction with nh 161 at malegaon bypass (from km 0.00 to 3.00 total length 3.00 km) and 0.00 to 0.460 length of nh753c

Read more
Balance work for shifting of utilities water pipe line possessed by adda for the work construction of 4 lane raniganj bypass of length 5.261 km on nh 60 new nh14 from km 275.20 of nh 60 to km 418.18 of nh2 new nh19 in paschim bardhaman,west bengal .

Balance work for shifting of utilities water pipe line possessed by adda for the work construction of 4 lane raniganj bypass of length 5.261 km on nh 60 new nh14 from km 275.20 of nh 60 to km 418.18 of nh2 new nh19 in paschim bardhaman,west bengal .

Read more
Ae services for development of access controlled highway of 4 lane from kadur (km 256.160) to hasnapur/potulamadugu (km 267.360) (mahabubnagar bypass) of hyderabad panaji section of nh167 (length 11.200km) under nh(o) in telangana on epc mode.

Ae services for development of access controlled highway of 4 lane from kadur (km 256.160) to hasnapur/potulamadugu (km 267.360) (mahabubnagar bypass) of hyderabad panaji section of nh167 (length 11.200km) under nh(o) in telangana on epc mode.

Read more
Construction of balance work nh morshi chandurbazar achalpur nh 353j in the state of maharashtra

Construction of balance work nh morshi chandurbazar achalpur nh 353j in the state of maharashtra

Read more
Irqp work of surda crossing to nh-33 road length -6.00km for the year 2024-25

Irqp work of surda crossing to nh-33 road length -6.00km for the year 2024-25

Read more
Stmc to kundral to wazar descope section nh 161a km 52.730 to 99.250 in the state of maharashtra length 4.76 km

Stmc to kundral to wazar descope section nh 161a km 52.730 to 99.250 in the state of maharashtra length 4.76 km

Read more
B.t. renewal work of (1) barman bypass (old nh-26) road length 1.70 k.m. (2) linga bypass major district (old nh-26) road length 2.00 k.m. (3) nh-26 to lolari approach road length 1.20 k.m. (4) kareli kodsa basadehi road length 0.80 k.m. (4th call)

B.t. renewal work of (1) barman bypass (old nh-26) road length 1.70 k.m. (2) linga bypass major district (old nh-26) road length 2.00 k.m. (3) nh-26 to lolari approach road length 1.20 k.m. (4) kareli kodsa basadehi road length 0.80 k.m.(4th call)

Read more
B.t. renewal work of (1) barman bypass (old nh-26) road length 1.70 k.m. (2) linga bypass major district (old nh-26) road length 2.00 k.m. (3) nh-26 to lolari approach road length 1.20 k.m. (4) kareli kodsa basadehi road length 0.80 k.m. (5th call)

B.t. renewal work of (1) barman bypass (old nh-26) road length 1.70 k.m. (2) linga bypass major district (old nh-26) road length 2.00 k.m. (3) nh-26 to lolari approach road length 1.20 k.m. (4) kareli kodsa basadehi road length 0.80 k.m. (5th call)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise