Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Gear Box Model Szn 450 Replacement Of Spares And Bearing And Other Repairing Work Including Its Overhauling As Per The Scope Of The Work, Rls, Bocp
|
| Description |
Repairing Of Gear Box Model Szn 450 Replacement Of Spares And Bearing And Other Repairing Work Including Its Overhauling As Per The Scope Of The Work, Rls, Bocp
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2026_MCL_359191_1 |
|
Reference Number |
MCL/GM BA/EnM/eTender/2026-27/262705 dtd 07/05/2026 |
| Tender Fee | 0 |
| EMD | 14800 |
| Tender Value | - |
| Place | Bharatpur OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=372056 |
| Start Date | May 08, 2026 15:30 |
| End Date |
Expired
18/05/2026
Expired 112 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Installation of the new transformer ( 5 mva) in all respects and minor repairing of the old transformer (4 mva) including its mocb and panels at rls, bocp
Installation of the new transformer ( 5 mva) in all respects and minor repairing of the old transformer (4 mva) including its mocb and panels at rls, bocp
Read moreRepairing of self aligning brackets (top bracket) and (bottom bracket) for conveyors at rls, bocp.
Repairing of self aligning brackets (top bracket) and (bottom bracket) for conveyors at rls, bocp.
Read moreRegarding repairing of the damage portion wall along the conveyor of c4 to pr theft of the rollers and bracket at rls, bocp.
Regarding repairing of the damage portion wall along the conveyor of c4 to pr theft of the rollers and bracket at rls, bocp.
Read more1) cleaning of the rls bunker and its periphery area 2) dismantling of the old damaged vibro feeder and re- erection of the new one including the fixing of the spares, shifting, alignment and commissioning in all respect at rls, bocp.
1) cleaning of the rls bunker and its periphery area 2) dismantling of the old damaged vibro feeder and re- erection of the new one including the fixing of the spares, shifting, alignment and commissioning in all respect at rls, bocp.
Read moreRenovation/repairing work of the tail end structure of drum c4 and strengthening work (platform and partial part of gallery) including its associates of rls, bharatpur ocp.
Renovation/repairing work of the tail end structure of drum c4 and strengthening work (platform and partial part of gallery) including its associates of rls, bharatpur ocp.
Read moreProviding and fixing barbed wire fencing with concertina coil at the opposite side of rls c4 belt line of bocp
Providing and fixing barbed wire fencing with concertina coil at the opposite side of rls c4 belt line of bocp
Read moreRepairing of rls1 panel (silo 1) including replacing input card and output card, repairing of the back panel and its commissioning at new silo, bocp
Repairing of rls1 panel (silo 1) including replacing input card and output card, repairing of the back panel and its commissioning at new silo, bocp
Read moreDismantling erection of top rollers bottom rollers its brackets in c4 c5 c6 c7 conveyors at rls bocp including its alignment cutting of rope along the conveyor or entangled at any drum of the conveyors for a period of 2 years
Dismantling erection of top rollers bottom rollers its brackets in c4 c5 c6 c7 conveyors at rls bocp including its alignment cutting of rope along the conveyor or entangled at any drum of the conveyors for a period of 2 years
Read moreThrough repairing work block no 8 nhs d/s (8 units) bocp under mugma area.
Through repairing work block no 8 nhs d/s (8 units) bocp under mugma area.
Read moreof your Industry type