Tender Details

Particulars Details
Title
Dismantling Erection Of Top Rollers Bottom Rollers Its Brackets In C4 C5 C6 C7 Conveyors At Rls Bocp Including Its Alignment Cutting Of Rope Along The Conveyor Or Entangled At Any Drum Of The Conveyors For A Period Of 2 Years
Description
Dismantling Erection Of Top Rollers Bottom Rollers Its Brackets In C4 C5 C6 C7 Conveyors At Rls Bocp Including Its Alignment Cutting Of Rope Along The Conveyor Or Entangled At Any Drum Of The Conveyors For A Period Of 2 Years
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id 2025_MCL_342609_1
Reference
Number
MCL/GM BA/EnM/eTender/252622 Dated 01/09/2025
Tender Fee 0
EMD 1.02 Lakh
Tender Value -
Place Bharatpur OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355156

Start Date September 02, 2025 15:30
End Date
Expired 17/09/2025

Expired 355 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling of c5 bifurcation chute, c4 discharge chute, c4 tail end chute, c6 and c7 discharge chute, silo loading chute etc., skirt board etc., replacement of motors, drums, damaged bearings , deck plates etc, repairing of gearbox etc. of rls, bocp

Dismantling of c5 bifurcation chute, c4 discharge chute, c4 tail end chute, c6 and c7 discharge chute, silo loading chute etc., skirt board etc., replacement of motors, drums, damaged bearings , deck plates etc, repairing of gearbox etc. of rls, bocp

Read more
Supply installation and commissioning class rooms c5, c6 and c7

Total cost in cif premises at supply, installation and commissioning class room c5, c6 and c7 at dahiwadi college dahiwadi state-maharashtra, india, including gst, all applicable taxes, clearing, transportation, insurance, unloading, installation etc

Read more
Cleaning of belt c1,c2,c3, c4, c5, c6 and c7 in chp at rajnagar r.o.siding of hasdeo area

Cleaning of belt c1,c2,c3, c4, c5, c6 and c7 in chp at rajnagar r.o.siding of hasdeo area

Read more
Regarding repairing of the damage portion wall along the conveyor of c4 to pr theft of the rollers and bracket at rls, bocp.

Regarding repairing of the damage portion wall along the conveyor of c4 to pr theft of the rollers and bracket at rls, bocp.

Read more
Preparatory jobs for carrying out belt joints and belt replacement works in c4, c5, c6 and c7 for steel cord belts and rubber belts including belt positioning as and when required as per the direction of engineer i/c at rls, bocp for a period of 1 yr

Preparatory jobs for carrying out belt joints and belt replacement works in c4, c5, c6 and c7 for steel cord belts and rubber belts including belt positioning as and when required as per the direction of engineer i/c at rls, bocp for a period of 1 yr

Read more
Repairing of self aligning brackets (top bracket) and (bottom bracket) for conveyors at rls, bocp.

Repairing of self aligning brackets (top bracket) and (bottom bracket) for conveyors at rls, bocp.

Read more
Dismantling of c5 bifurcation chute, c4 discharge chute, c4 tail end chute, c6 and c7 discharge chute, silo loading chute etc., skirt board etc., replacement of motors, drums, damaged bearings , deck plates etc, repairing of gearbox etc. works

Dismantling of c5 bifurcation chute, c4 discharge chute, c4 tail end chute, c6 and c7 discharge chute, silo loading chute etc., skirt board etc., replacement of motors, drums, damaged bearings , deck plates etc, repairing of gearbox and miscellaneous

Read more
Providing and fixing barbed wire fencing with concertina coil at the opposite side of rls c4 belt line of bocp

Providing and fixing barbed wire fencing with concertina coil at the opposite side of rls c4 belt line of bocp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise