Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of The New Transformer ( 5 Mva) In All Respects And Minor Repairing Of The Old Transformer (4 Mva) Including Its Mocb And Panels At Rls, Bocp
|
| Description |
Installation Of The New Transformer ( 5 Mva) In All Respects And Minor Repairing Of The Old Transformer (4 Mva) Including Its Mocb And Panels At Rls, Bocp
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_MCL_323180_1 |
|
Reference Number |
MCL/BOCP/EnM/e-Tender/242513 Dated 11.12.2024 |
| Tender Fee | 0 |
| EMD | 2440 |
| Tender Value | - |
| Place | BHARATPUR OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335002 |
| Start Date | December 12, 2024 15:30 |
| End Date |
Expired
23/12/2024
Expired 623 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
1) cleaning of the rls bunker and its periphery area 2) dismantling of the old damaged vibro feeder and re- erection of the new one including the fixing of the spares, shifting, alignment and commissioning in all respect at rls, bocp.
1) cleaning of the rls bunker and its periphery area 2) dismantling of the old damaged vibro feeder and re- erection of the new one including the fixing of the spares, shifting, alignment and commissioning in all respect at rls, bocp.
Read moreRepairing of gear box model szn 450 replacement of spares and bearing and other repairing work including its overhauling as per the scope of the work, rls, bocp
Repairing of gear box model szn 450 replacement of spares and bearing and other repairing work including its overhauling as per the scope of the work, rls, bocp
Read moreMinor repair of 5 and 10 mva power transformer
Minor repair of 5 and 10 mva power transformer
Read moreRegarding repairing of the damage portion wall along the conveyor of c4 to pr theft of the rollers and bracket at rls, bocp.
Regarding repairing of the damage portion wall along the conveyor of c4 to pr theft of the rollers and bracket at rls, bocp.
Read moreProviding and fixing barbed wire fencing with concertina coil at the opposite side of rls c4 belt line of bocp
Providing and fixing barbed wire fencing with concertina coil at the opposite side of rls c4 belt line of bocp
Read moreDismantling erection of top rollers bottom rollers its brackets in c4 c5 c6 c7 conveyors at rls bocp including its alignment cutting of rope along the conveyor or entangled at any drum of the conveyors for a period of 2 years
Dismantling erection of top rollers bottom rollers its brackets in c4 c5 c6 c7 conveyors at rls bocp including its alignment cutting of rope along the conveyor or entangled at any drum of the conveyors for a period of 2 years
Read moreMinor overhauling of 80 mva, 400/11.5-11.5 kv station transformer-2
Minor overhauling of 80 mva, 400/11.5-11.5 kv station transformer-2
Read moreOf 5 mva power transformer in the electricity transformer repairing workshop akbarpur
Of 5 mva power transformer in the electricity transformer repairing workshop akbarpur
Read moreof your Industry type