Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bengaluru Salem Section : Construction Of Rcc Side Drain For A Length Of 1500m In Connection With The Work Of Strengthening Of Bank By Providing Standard Width In Isolated Locations For A Length Of 18.85km From 145/650 165/600 Sl In Aden/Dharmapuri Section. Maintenance Period Is 6 Months
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 76551449 |
|
Reference Number |
17SBC24OF31-07-24Item-03 |
| Tender Fee | 0 |
| EMD | 2.39 Lakh |
| Tender Value | |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76551449/viewNitPdf_4662185.pdf |
| Start Date | July 31, 2024 21:43 |
| End Date |
Expired
27/08/2024
Expired 675 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw-i: bengaluru - salem sec: strengthening of bank by providing standard width in isolated locations for a length of 18.85km from km 145/650-165/600 sl in aden/dharmapuri section. sw-ii: bengaluru - salem sec: cess work in connection with the work of through ballast recoupment of points and crossings at dharmapuri (dpj), rayakkottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards-total 11 nos in aden/dharmapuri section. maintenance period is 6 months or one mo
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : proposed extension road surface at lc 143 in aden/dpj section. sw ii : chikka banavara - hassan section : construction of rcc side drain for a length of 750m in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : deepscreening work of 14.65 km length at km 205/350-220/000 sl, in connection with the work of sbc-sa section : ctr(p) of exg. 52kg/90 uts rails on 52kg psc sleepers of 1540 nos/km with 60kgs/90 uts rails on 60kg psc sleepers of 1660 nos/km for a length of 14.65 km from km 205/350-220/000 sl in den/south/sbc section sw ii : bengaluru - salem section : through sleeper renewal for a length of 1 km from 110/500-118/000 (scattered locations) in aden/dharmapuri se
For complete deion and other details, please refer to tender
Read moreSw i : chikka banavara - hassan section : through ballast recoupment for a length of 7.881 km in looplines of b g nagar (bgnr), hirisave (hise), shravanabelagola (sbga), channarayapatna (cnpa) and samudravalli (dsvs) yards. sw ii : bengaluru - salem section : through ballast recoupment of points and crossing at dharmapuri (dpj), rayakottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards - total 11 nos in aden/dharmapuri section. sw iii : bengaluru - salem sec
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : construction of side drain for a length of 1.5km in connection with the work of through ballast recoupment of points and crossings at dharmapuri (dpj), rayakottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards - total 11 nos. in aden/dpj section . maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : collection of ballast including leading and loading at periya naga thunai (prnt) depot in connection with the work of bengaluru - salem ctr(p) for a length of 16km from 11/900-23/000 and 72/100-77/000 sl to replace d mark rails . sw ii : bengaluru - salem section : collection of ballast including loading at periya naga thunai (prnt) ballast depot in connection with the work of through ballast recoupment for a length of 16.011km in looplines of aden/dharmapuri (dpj) sub
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : pro. raising and extension of platform at palakkodu (pcv) station - 630m including ramp (extension of 70m at pf-1 and raising of 560m at pf-2 of pcv station) and marandahalli (mzu) station - 320m (extension of 160m each at pf-1 & 2) - total 950m. sw ii : bengaluru - salem sec : construction of boundary wall between chainage from 181/000 to 182/000 (lhs and rhs) for a length of 1500m in aden/dharmapuri section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru-salem section : construction of rcc drain 600m in connection with the work of sbc-sa sec : strengthening of bank by providing standard width and improving drainage at isolated locations from km 68/100 to 143/400 sl for a length of 17.26 km. sw ii : bengaluru - salem section : construction of rcc drain 3000m and ballast retaning wall 1900m in connection with the work of sbc-sa sec: complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts ra
For complete deion and other details, please refer to tender
Read moreSw i : construction of ballast retaining wall 6000m in connection with the work of bengaluru-salem section ctr(p) for a length of 16km from 11/900-23/0 and 72/100-77/0 sl to replace d mark rails . sw ii : construction of rcc side drain for a length of 2200m in connection with the work of bengaluru-salem section ctr(p) for a length of 16km from 11/900-23/0 and 72/100-77/0 sl to replace d mark rails . sw iii : construction of drain for 1200m in connection with the work of
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road section : construction of rcc drain for a length of 1500m and ballast retaining wall for a length of 1000m in connection with the work of complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90uts rails and 60kg wider based sleeper of 1660/km for a length of 19.4 tkm from km 49/000-68/400 dn line in aden/ypr section. sw ii : bengaluru - sampige road section : construction of drain for a length of 750m and ballast retaining wall
For complete deion and other details, please refer to tender
Read moreof your Industry type