Tender Details
Particulars | Details |
---|---|
Title |
Bengaluru Salem Section : Construction Of Rcc Side Drain For A Length Of 1500m In Connection With The Work Of Strengthening Of Bank By Providing Standard Width In Isolated Locations For A Length Of 18.85km From 145/650 165/600 Sl In Aden/Dharmapuri Section. Maintenance Period Is 6 Months
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76551449 |
Reference Number |
17SBC24OF31-07-24Item-03 |
Tender Fee | 0 |
EMD | 2.39 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76551449/viewNitPdf_4662185.pdf |
Start Date | July 31, 2024 21:43 |
End Date |
27/08/2024 ( Expired 237 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sw i : bengaluru - salem section : deepscreening work of 14.65 km length at km 205/350-220/000 sl, in connection with the work of sbc-sa section : ctr(p) of exg. 52kg/90 uts rails on 52kg psc sleepers of 1540 nos/km with 60kgs/90 uts rails on 60kg psc sleepers of 1660 nos/km for a length of 14.65 km from km 205/350-220/000 sl in den/south/sbc section sw ii : bengaluru - salem section : through sleeper renewal for a length of 1 km from 110/500-118/000 (scattered locations) in aden/dharmapuri se
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : proposed extension road surface at lc 143 in aden/dpj section. sw ii : chikka banavara - hassan section : construction of rcc side drain for a length of 750m in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru -sampige road sec: earthwork in connection with the work of compete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60 kg wider base sleeper of 1660/km for a length of 17.15 km from km 17/650-10/500 and 39/000-49/000 dn line in aden/yeswanthpur section. sw ii : bengaluru -sampige road sec: earthwork in connection with the work of complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts ra
For complete deion and other details, please refer to tender
Read moreChikbanavara - hassan section : sw i : construction of rcc drain for a length of 2.2 km in scattered locations between km 5/500-55/300 in aden/kunnigal section. sw ii : construction of rcc side drain 1000m and ballast retaining wall 1000m in connection with the work of baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru-salem section : construction of rcc drain 600m in connection with the work of sbc-sa sec : strengthening of bank by providing standard width and improving drainage at isolated locations from km 68/100 to 143/400 sl for a length of 17.26 km. sw ii : bengaluru - salem section : construction of rcc drain 3000m and ballast retaning wall 1900m in connection with the work of sbc-sa sec: complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts ra
For complete deion and other details, please refer to tender
Read moreBengaluru-salem section : sw i : complete track renewal (p) of existing 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dharmapuri section. sw ii : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 22.0 km from km 23/000-45/000 (sl) in aden/dpj section. sw iii : complete track ren
For complete deion and other details, please refer to tender
Read moreDen/south/sbc sec : cess repair/widening work in connection with the work of (a) sbc-sa sec : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60 kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section. (b) baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru-salem section : construction of officers rest house (orh) at dharmapuri (dpj) station in aden/dpj sub-division. sw ii : proposed provision of pay and use toilet at banaswadi (band), platform no. 1. maintenance period is 12 months
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: construction of rcc drain for a length of 1km in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 216/000-238a/000 up and down line for 8.66kms and 289/100-302/600 up and down for 5.653kms (total length - 14.313kms). maintenance period is 6 months.
For complete deion and other details, please refer to tender
Read moreof your Industry type