Tender Details
Particulars | Details |
---|---|
Title |
Bengaluru Salem Section : Construction Of Rcc Side Drain For A Length Of 1500m In Connection With The Work Of Strengthening Of Bank By Providing Standard Width In Isolated Locations For A Length Of 18.85km From 145/650 165/600 Sl In Aden/Dharmapuri Section. Maintenance Period Is 6 Months
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76551449 |
Reference Number |
17SBC24OF31-07-24Item-03 |
Tender Fee | 0 |
EMD | 2.39 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76551449/viewNitPdf_4662185.pdf |
Start Date | July 31, 2024 21:43 |
End Date |
27/08/2024 ( Expired 259 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sw i : bengaluru - salem section : deepscreening work of 14.65 km length at km 205/350-220/000 sl, in connection with the work of sbc-sa section : ctr(p) of exg. 52kg/90 uts rails on 52kg psc sleepers of 1540 nos/km with 60kgs/90 uts rails on 60kg psc sleepers of 1660 nos/km for a length of 14.65 km from km 205/350-220/000 sl in den/south/sbc section sw ii : bengaluru - salem section : through sleeper renewal for a length of 1 km from 110/500-118/000 (scattered locations) in aden/dharmapuri se
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : proposed extension road surface at lc 143 in aden/dpj section. sw ii : chikka banavara - hassan section : construction of rcc side drain for a length of 750m in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru -sampige road sec: earthwork in connection with the work of compete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60 kg wider base sleeper of 1660/km for a length of 17.15 km from km 17/650-10/500 and 39/000-49/000 dn line in aden/yeswanthpur section. sw ii : bengaluru -sampige road sec: earthwork in connection with the work of complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts ra
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru-salem section : construction of rcc drain 600m in connection with the work of sbc-sa sec : strengthening of bank by providing standard width and improving drainage at isolated locations from km 68/100 to 143/400 sl for a length of 17.26 km. sw ii : bengaluru - salem section : construction of rcc drain 3000m and ballast retaning wall 1900m in connection with the work of sbc-sa sec: complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts ra
For complete deion and other details, please refer to tender
Read moreBengaluru-salem section : sw i : complete track renewal (p) of existing 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dharmapuri section. sw ii : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 22.0 km from km 23/000-45/000 (sl) in aden/dpj section. sw iii : complete track ren
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: construction of rcc drain for a length of 1km in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 216/000-238a/000 up and down line for 8.66kms and 289/100-302/600 up and down for 5.653kms (total length - 14.313kms). maintenance period is 6 months.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : construction of rcc side drain for a length of 1500m in connection with the work of strengthening of bank by providing standard width in isolated locations for a length of 18.85km from 145/650-165/600 sl in aden/dharmapuri section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw-i: bengaluru - salem sec: strengthening of bank by providing standard width in isolated locations for a length of 18.85km from km 145/650-165/600 sl in aden/dharmapuri section. sw-ii: bengaluru - salem sec: cess work in connection with the work of through ballast recoupment of points and crossings at dharmapuri (dpj), rayakkottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards-total 11 nos in aden/dharmapuri section. maintenance period is 6 months or one mo
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: strengthening of bank by providing standard width and improving drainage at isolated locationsfrom km 216/000-238a/000 up and down line for 8.66kms and 289/100-302/600 up and down for 5.653kms (total length - 14.313kms). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type