Tender Details
Particulars | Details |
---|---|
Title |
Sw I: Bengaluru Salem Section: Hosur (Hsra) Provision Of Stp Tank Of 50 Kld Capacity. Sw Ii: Bengaluru Salem Section: Dharmapuri (Dpj) Provision Of Stp Tank Of 50 Kld Capacity. Maintenance Period Is 24 Months
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76576160 |
Reference Number |
17SBC24OF31-07-24Item-04 |
Tender Fee | 0 |
EMD | 3.34 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76576160/viewNitPdf_4663957.pdf |
Start Date | July 31, 2024 23:58 |
End Date |
27/08/2024 ( Expired 237 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Work contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Read moreHorticultural maintenance of specific area in phase-i of joseph baptista garden at bhandarwada hill reservoir under a.e.(m.)w.w. city-ii section for 2 months
Horticultural maintenance of specific area in phase-i of joseph baptista garden at &#x0d bhandarwada hill reservoir under a.e.(m.)w.w. city-ii section for 2 months&#x0d
Read moreOperation and maintenance of stp 3 mld capacity on sbr technology at moonak town distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months
Operation and maintenance of stp 3 mld capacity on sbr technology at moonak town distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months
Read moreRepair and maintenance of railway track at rth swarupganj (rajasthan) of ahmedabad-cluster, area-ii for a period of 02 years (i.e. 24 months)
Repair and maintenance of railway track at rth swarupganj (rajasthan) of ahmedabad-cluster, area-ii for a period of 02 years (i.e. 24 months)
Read moreComprehensive operation and maintenance (comc) of 24 nos. mechanical road sweeping machines and 04 nos. tata make of 9 kl capacity water tankers for a period of 04 months.
Comprehensive operation and maintenance (comc) of 24 nos. mechanical road sweeping machines and 04 nos. tata make of 9 kl capacity water tankers for a period of 04 months.
Read moreRoutine civil maintenance of power house camps, office buildings through work contracts for barrage power house-i/ chekkanur and barrage power house-ii/nerinjipettai for a period of 12 months from the date of utilization for the year 2024-2025
Routine civil maintenance of power house camps, office buildings through work contracts for barrage power house-i/ chekkanur and barrage power house-ii/nerinjipettai for a period of 12 months from the date of utilization for the year 2024-2025
Read moreArmo at srfti kolkata for the year 2025 2026 for phase i and ii sub head day to day complete building maintenance of office and residential complex for a period of 12 twelve months
Armo at srfti kolkata for the year 2025 2026 for phase i and ii sub head day to day complete building maintenance of office and residential complex for a period of 12 twelve months
Read moreOperation and maintenance of d.i. pipe line, over head tank, sump well, storm water line, street light at industrial park ratlam distt. ratlam for a period of 24 months
Operation and maintenance of d.i. pipe line, over head tank, sump well, storm water line, street light at industrial park ratlam distt. ratlam for a period of 24 months
Read moreA/r m/o water supply under sub division no. ii during 2024-25.sw-repair and maintenance of rural road, water supply, residential and non-residential building whenever required for tugapur section under sd-ii, nacd, apwd, mayabunder for the period of
A/r m/o water supply under sub division no. ii during 2024-25.sw-repair and maintenance of rural road, water supply, residential and non-residential building whenever required for tugapur section under sd-ii, nacd, apwd, mayabunder for the period of
Read moreNctps i cm circle cm ii watering to the tree saplings along the eastern side bund ch.3345.00m to ch.4625.00m in ash dyke area and maintenance for a period of four months from the date of commencement.
Nctps i cm circle cm ii watering to the tree saplings along the eastern side bund ch.3345.00m to ch.4625.00m in ash dyke area and maintenance for a period of four months from the date of commencement.
Read moreof your Industry type