Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bengaluru Mysuru Section: Sw I: Provision Of Stp Tank Of 50 Kld Capacity At Kengeri (Kgi) Station. Sw Ii: Hejjala Iridm Proposed Construction Of Boundary Wall Between Km 19/400 To 20/400 At Hejjala Iridm Along The Demonstration Track For 140 Tonne Crane. Maintenance Period Is 24 Months. (Composite Work)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73961964 |
|
Reference Number |
06SBC24of07-03-2024-Item3 |
| Tender Fee | 0 |
| EMD | 3.19 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73961964/viewNitPdf_4500456.pdf |
| Start Date | March 07, 2024 22:56 |
| End Date |
Expired
30/03/2024
Expired 928 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bengaluru - mysuru section: sw-i: provision of stp tank of 50kld capacity at kengeri (kgi) station. sw-ii: hejjala iridm - proposed construction of boundary wall between km 19/400 to 20/400 at hejjala iridm along the demonstration track for 140 tonne crane. maintenance period is 24 months. (composite work)
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: provision of stp tank of 50kld capacity at kengeri (kgi) station. maintenance period is 24months.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: hejjala iridm - proposed construction of boundary wall between km 19/400 to 20/400 at hejjala iridm along the demonstration track for 140 tonne cranes. sw-ii: proposed improvements for video surveillance system at ksr bengaluru (sbc), bangalore cantt (bnc) and mandya (mya) stations. maintenance period is 6months.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: provision of stp tank of 50kld capacity at kengeri (kgi) station. sw-ii: improvements to road-5 loading and unloading area at settihalli (set) from km 62/300-900 and construction of merchant room at settihalli yard. sw-iii: sw-ii: proposed provision of pay and use toilets at settihalli (set) - (platform - 1) and bidadi (bid) (platform 1/2). sw-iv: kengeri: proposed provision of escalators up and down on platform no. 2/3 and 1 (balance work). (composite work).
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: through fitting renewal (tfr) for a length of 27.15kms from km 43/600-65/390, 91/760-93/570 and 99/650-101/200 (down line) and 43/600-45/210, 54/610-55/000 (up line). sw-ii: bengaluru - mysuru section: through turnout renewal (ttr) of existing 52kg curved switch and cms crossing with 60kg curved switch and cms crossing - total 10 sets (1 in 8.5) at nyh, kgi and hjl yards. sw-iii: bengaluru - mysuru section: through turnout renewal (ttr) of existing 52kg curved
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreSw-i:- mysuru jn.- hole narsipur (sl) - trr(p) - 29.575 tkm ( km.55/850 - 67/350 & 68/325-86/400) sw-ii:- mys-y - trr(p) -7.175 km, km.130.45 - km.135.7 dn line, km.128.9 - km.130 & km.135.7 to km.136.525 up line sw-iii:- mysuru - yeliyur - ctr(p) - 2.150 tkm (km.136/525 - km. 137/600 up -1.075 tkm & dn - 1.075 tkm) sw-iv:- aden/mys:- isd on loop lines - ap -rd1& 3, kdo -rd1& 3, ntw -rd1& 3, cmnr -rd1& 3 , bdrl rd1&4, panp rd1&4, nhy rd1&4, blga rd1&
For complete deion and other details, please refer to tender
Read moreof your Industry type