Tender Details
Particulars | Details |
---|---|
Title |
Sw I : Bengaluru Salem Section : Construction Of Officers Rest House (Orh) At Dharmapuri (Dpj) Station In Aden/Dpj Sub Division. Sw Ii : Proposed Provision Of Pay And Use Toilet At Banaswadi (Band), Platform No. 1. Maintenance Period Is 12 Months
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77982426 |
Reference Number |
25SBC24OF17-10-24Item-04 |
Tender Fee | 0 |
EMD | 2.01 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77982426/viewNitPdf_4744248.pdf |
Start Date | October 17, 2024 23:16 |
End Date |
11/11/2024 ( Expired 161 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hubballi division:- sw-i:- bagewadi station-raising and extension of platform no.01 to make high level of 560m length with cement concrete flooring at bagewadi station. (maintenance period= 06 months ) .sw-ii:-proposed construction of track machine rest house in chikkodi road, chinchili, sedbal and vijaynagar. (maintenance period= 03 years) sw-iii-provision of low cost platform shelters at bagewadi station. (maintenance period= 06months )
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : deepscreening work of 14.65 km length at km 205/350-220/000 sl, in connection with the work of sbc-sa section : ctr(p) of exg. 52kg/90 uts rails on 52kg psc sleepers of 1540 nos/km with 60kgs/90 uts rails on 60kg psc sleepers of 1660 nos/km for a length of 14.65 km from km 205/350-220/000 sl in den/south/sbc section sw ii : bengaluru - salem section : through sleeper renewal for a length of 1 km from 110/500-118/000 (scattered locations) in aden/dharmapuri se
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : proposed extension road surface at lc 143 in aden/dpj section. sw ii : chikka banavara - hassan section : construction of rcc side drain for a length of 750m in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem : supply, installation, commissioning and maintenance of track mounted automatic gauge face lubricators on 39 curves for period of 5 years in sse/p.way/dpj(n) section under den/south/sbc jurisdiction sw ii : chikka banavara - hassan sec: supply, installation, commissioning and maintenance of track mounted automatic gauge face lubricators on 29 curves in sse/pway/hsra section and 01 curve in sse/pway/cnpa section under den/south/sbc jurisdiction (service tender) (2 pac
For complete deion and other details, please refer to tender
Read moreElectrical arrangements for- [1] proposed construction of type -ii quarters in lieu of qrts no.10/a-d, 12, 13, 20/a-b (8 units) at bidadi (bid), [2] yelahanka (ynk)-provision of parcel office, parcel stacking shed, tc office and sec. cmi room, [3] construction of foot over bridge (fob) at tyakal (tcl ) station (4 track crossing), and [4] shravanabelagola (sbga)- proposed construction of platform toilet at pf-1 of sbga station in aden/kigl sub-division and [5] provision of pay & use toilet
For complete deion and other details, please refer to tender
Read moreBengaluru-salem section : sw i : complete track renewal (p) of existing 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dharmapuri section. sw ii : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 22.0 km from km 23/000-45/000 (sl) in aden/dpj section. sw iii : complete track ren
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru-salem section : construction of officers rest house (orh) at dharmapuri (dpj) station in aden/dpj sub-division. sw ii : proposed provision of pay and use toilet at banaswadi (band), platform no. 1. maintenance period is 12 months
For complete deion and other details, please refer to tender
Read moreKsr bengaluru: sw-i: proposed civil works for the provision of lift - 1no. at pf no. 9 and 10 for fob at bnc end of ksr bengaluru station. sw-ii: proposed civil works for the provision of lift - 1no. at pf no. 5 and 6 for fob at bnc end of ksr bengaluru station. sw-iii: provision of lift to fob connecting metro sky walk on back side of ksr bengaluru station. sw-iv: proposed provision of pay and use toilets at settihalli (set) - (platform - 1) and bidadi (bid) (platform 1/2). sw-v: kengeri: p
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreof your Industry type